top of page
‹ חזרה

Book Balcony Railing Installation: Step-by-Step Booking Guide

t316-38

t316-38

To book balcony railing installation, send us photos and a short description of your balcony, then we arrange an on-site measurement visit. After you approve the written drawing and specification, we manufacture the railing in our Tel Aviv factory and install it at your home.

Start with an Inquiry and Photos

The booking begins with a simple inquiry. Send us clear photos of the balcony, the wall or floor it attaches to, and the area around it. Note the approximate length and height if you know them, and say whether you prefer iron, aluminum, stainless steel or glass.

Tell us what you want the railing to achieve. Some homeowners want a classic look, others want something minimal with a view. Your photos and description help us understand the job before anyone visits, so the first conversation stays focused and practical.

On-Site Measurement Visit

After reviewing your inquiry, we schedule a visit to measure the balcony on site. Our team checks the exact dimensions, the condition of the surface, the fixing points and any obstacles such as shutters, lighting or drainage.

  • Exact length and height of each section
  • Type of base: concrete, tile or existing railing
  • Access and any building committee requirements

Measuring on site prevents surprises later and is the foundation of a railing that fits properly.

Drawing and Written Specification

Once measurements are complete, we prepare a drawing and a written specification. The drawing shows the layout, the pattern and the fixing method. The specification lists materials, finish and installation steps in plain language.

Please read both carefully and ask questions. This is the moment to change the design, the material or the finish. Clear documents make the production and installation smoother for everyone involved.

Client Approval Before Production

We do not start manufacturing until you approve the drawing and specification in writing. Approval protects both sides: you know exactly what will be built, and we work from a confirmed plan.

If your building has a committee or your architect or interior designer is involved, share the documents with them before approving. Their comments can be included at this stage, which is far easier than changing a finished piece.

Factory Production and Finishing

After approval, the railing is made to measure in our factory on Rival Street in Tel Aviv, where we have worked in metal since 1945. Depending on the material, the pieces are cut, welded, assembled and checked against the drawing.

Finishing follows production. Steel parts can be hot-dip galvanized and powder coated for durability, and aluminum and stainless steel are finished to suit the design. Every piece is inspected before it leaves the workshop.

Installation at Your Balcony

On the agreed date, our installers bring the finished railing to your home and fix it according to the specification. We confirm the level, alignment and secure fixing before we finish, and we tidy the work area.

For railing heights, spacing and load requirements, the Israeli railing standard SI 1142 applies in general terms, and exact values are checked with your engineer during planning rather than assumed.

Frequently asked questions

How long does the booking process take?

The timeline depends on the size of the job and our current schedule. We confirm the expected dates for the measurement, approval and installation when we agree on the plan.

Do I need to be home for the measurement?

It helps to be present or to have someone who can answer questions about the balcony. We can arrange a suitable time to visit and check the site together.

Can I change the design after approval?

Changes are best made before you approve the drawing. Once production starts, changes may affect the work already done, so we discuss them with you first.

Do you work with building committees and architects?

Yes, we work with private homeowners, building committees, contractors, architects and interior designers. Share the drawing with them before final approval.

Common mistakes to avoid

Many homeowners send too few photos or skip the on-site measurement, which leads to wrong sizes. Approving the drawing without checking it carefully is another common error that is harder to fix after production.

Our recommendation

Measure your balcony yourself as a rough check, but always let the installer take the final measurements on site. Ask for the drawing to be shared with your building committee or engineer before you approve it.

Summary

Booking balcony railing installation with us is simple: inquiry with photos, on-site measurement, drawing and specification, your written approval, factory production and professional fitting.

Send us photos of your balcony today and we will arrange you

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ