A bulk aluminum window order works best when the developer supplies a complete schedule of openings, approved drawings and a clear delivery plan before production starts. Techno Kol Uzi manufactures aluminum windows to measure at its Tel Aviv factory, so each unit is made for its exact opening rather than taken from stock.

Why developers order aluminum windows in bulk

When a residential building has dozens of apartments, the window package is one of the largest and most time-sensitive parts of the project. Ordering all units together lets the developer plan production in a single run, keep the look consistent across floors, and align deliveries with the construction schedule.

Bulk ordering also simplifies coordination. One specification, one approval cycle and one installation plan replace many small, scattered orders that are easy to lose track of on a busy site.

Preparing your window schedule

A good bulk order starts with a window schedule that lists every opening by apartment type, floor and position. For each one, note the opening style, the glazing you need and any special requirements such as privacy glass or a specific finish.

  • Apartment type and floor for each opening
  • Opening style and operation direction
  • Glazing and finish requirements
  • Any openings that differ from the standard unit

A clear schedule reduces questions later and makes approval faster for everyone involved.

Measurements and drawings

Dimensions should be confirmed on site once the structural openings are finished, since rough openings can vary from the plans. Techno Kol Uzi measures on site and then prepares drawings and a written specification for each window type in the order.

The drawings show sizes, profiles and operation, and they become the reference for production. Review them carefully before approving, because a correction made after production is far more costly than one made on paper.

Approval, production and finishing

Once the developer or architect signs off on the drawings and specification, production begins in the factory. Batches are typically organized by window type so that repeated units are made efficiently and consistently.

Finishing is handled as part of the process, and the chosen surface treatment should match the specification approved at the start. Keeping approved finishes on the same sheet as the drawings prevents mismatches between floors.

Delivery planning with the construction schedule

Delivering windows too early can block a site, while delivering them too late can hold up finishing trades. Agree on a delivery sequence that follows the building's progress, with units grouped by floor or stack where possible.

  • Confirm the site's readiness before each delivery
  • Group units by floor or apartment type
  • Agree on a contact person for site access

Installation and quality checks

Installation should be checked against the approved drawings for each opening. Verify that frames are level and plumb, that operation is smooth and that seals and flashing are in place before finishing work covers them.

A short inspection after each floor is installed catches small issues early, when they are quick and inexpensive to correct.

Frequently asked questions

How early should a developer send the window schedule?

Send it as soon as the apartment layouts are fixed, so measurements and drawings can start before construction reaches the window stage. Early planning leaves more room for approvals.

Do you measure on site for bulk orders?

Yes, on-site measurement is part of the process so that each window is made to the actual opening. Drawings and a written specification follow the measurement.

Can all windows in a building have the same finish?

Yes, a single finish can be specified for the whole order to keep the building's appearance consistent. The approved finish is recorded with the drawings.

Who approves the drawings before production?

The developer, architect or project representative reviews and signs off the drawings and specification. Production starts only after this approval.

Common mistakes to avoid

Ordering before the openings are final and skipping on-site measurement often leads to windows that do not fit. Approving drawings without checking every opening type is another common source of costly corrections.

Our recommendation

Build the window schedule with the architect and freeze the apartment layouts before ordering, then approve one sample unit of each type before running the full batch.

Summary

Bulk aluminum window orders succeed with a complete schedule, on-site measurement, approved drawings and delivery timed to the build.

Send us your window schedule and floor plans, and we will pr