top of page
‹ חזרה

Bulk Ordering Security Bars for Developers and Contractors

t255-43

t255-43

Developers and contractors can order security bars in bulk by sending all unit openings with photos and a clear layout, then approving one drawing and specification that is used across the project. Measuring every opening on site and standardizing finishes before production keeps all units consistent and avoids costly rework at installation.

Why bulk orders need a different approach

When a project includes dozens of apartments, a small mistake in one measurement repeats across the whole building. Bulk security bars work best when the order is planned as a single system rather than as separate jobs. Consistent sizes, profiles and finishes make the building look coherent and make installation faster for the crew.

Before ordering, decide which openings get which type of bar, such as windows, balcony doors or ground floor units, so the factory receives clear groups rather than a long unsorted list.

Preparing the unit list and photos

A useful bulk inquiry includes a simple table: floor, unit number, opening type, and the approximate dimensions. Photos of each opening, taken straight on and from a few steps back, help identify wall type, frame material and any obstacles such as shutters, air conditioner units or tiles.

  • Number every opening on the building plan
  • Note frame material and whether it is recessed or surface mounted
  • Flag units that differ from the standard layout

On-site measurement and verification

Drawings are only as accurate as the measurements behind them. Plan a measuring visit that covers a representative sample of units across every floor and orientation. Walls are not always plumb and openings can vary by a few millimeters between floors, so measuring each group rather than assuming one size is the safer route.

Measure width and height at more than one point and record the sill and frame depth. Any irregular opening should be marked on the sheet so it is produced separately.

Drawings, specification and approval

Before production, the factory prepares drawings and a written specification covering profile type, bar spacing, fixing method, finish and anchor points. Developers and engineers should review and approve these documents in writing. Once approved, changes become expensive, so it is worth checking the fixing details against the building structure and the handrail and guard requirements of Israeli Standard SI 1142, with exact values confirmed by the project engineer.

Approve one master drawing for each opening type and list any exceptions clearly.

Production, finishing and quality control

Bulk production benefits from running identical items together, which keeps dimensions and welding consistent. Finishing choices matter across a whole building: hot-dip galvanizing followed by powder coating is common for exterior iron work because it protects against weather and coastal air. Choose one color and one finish for the entire project so every facade matches.

Ask for a sample piece to be checked before the full batch is released, and confirm how items will be labeled by unit so installers do not have to sort them on site.

Installation coordination and handover

Coordinate delivery with the building schedule so bars arrive floor by floor, not all at once in a crowded site. Agree on who is responsible for wall preparation, anchors and sealing, and make sure the installation crew has the approved drawings. Plan a final walk-through with the developer or building committee to check alignment, fixing quality and finish on a sample of units before the rest are signed off.

  • Deliver in labeled groups per floor
  • Confirm anchoring method with the site engineer
  • Inspect a sample before final handover

Frequently asked questions

How many units should be measured before ordering in bulk?

Measure a representative sample across every floor and facade direction, and measure any unusual openings individually. This shows whether the building is consistent or whether separate groups are needed.

Can a building committee approve the drawings on behalf of all owners?

This depends on the building's internal rules and the committee's mandate. Confirm the approval process with the committee and the project engineer before production starts.

Do all units need the same color and finish?

For a cohesive facade, yes. Choosing one color and finish for the whole project keeps the building looking uniform and simplifies ordering and touch-up later.

What information should a contractor send first?

Send the unit list with floor and opening type, photos of each opening, and any known dimensions. A building plan with numbered units is also very helpful.

Common mistakes to avoid

The most common mistake is assuming every opening in a building is the same size and ordering from a single measurement. Skipping sample checks and approval of the final drawings also leads to costly corrections after production.

Our recommendation

Measure a sample from every floor before finalizing the order, then approve one master drawing per opening type in writing. Ask for a sample piece to be checked before the full batch is produced.

Summary

Bulk ordering security bars works best with a complete unit list, verified measurements, approved drawings and one consistent finish. Planning these steps early keeps the whole project on schedule and looking uniform.

Send us your unit list and photos, and we will help you plan

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ