top of page
‹ חזרה

Common Metal Ordering Mistakes to Avoid for Custom Architectural Metal

t497-48

t497-48

The most common metal ordering mistakes are ordering before measuring on site, leaving finishes and load requirements undecided, and skipping a written specification. Avoiding them keeps custom architectural metal on schedule, on fit and easy to install.

Ordering Before On-Site Measurement

Many first-time buyers send a drawing or a rough estimate of dimensions and ask for production straight away. Walls are rarely perfectly square, openings shift during construction, and floor finishes change the final height. A custom piece built from unverified numbers may not fit when it arrives.

Measure on site, or have the factory do it, before production starts. Record each dimension with the reference point it was taken from so the drawing matches the building as it really is.

Leaving Finish and Coating Undecided

Finish choices affect appearance, durability and sometimes the sequence of work. Hot-dip galvanizing, powder coating and stainless finishes behave differently in exterior and coastal conditions, and the choice should be made early.

  • Decide the finish for each element before drawing approval.
  • Confirm the color reference in writing.
  • Check whether the finish requires extra handling time.

Skipping the Written Specification

A verbal agreement or a quick message is not enough for custom work. Without a written specification, profiles, thicknesses, fixings and finishes can be interpreted in different ways by the client, the architect and the workshop.

Ask for a drawing and written specification that lists materials, dimensions, finishes and installation details. Review it carefully and approve it in writing before production begins.

Ignoring Structural and Safety Requirements

Railings, balustrades, pergolas and steel structures carry loads and must meet safety expectations. Designers sometimes choose a profile or spacing based only on appearance. Israeli railing requirements under standard SI 1142 are relevant for many projects, and the exact values should always be verified with the responsible engineer rather than assumed.

Share the intended use, expected loads and location early so the design can be checked before production.

Forgetting Installation and Interfaces

A metal element is only as good as its connection to the building. Fixings, embedded plates, substrate type and access for installers all influence the design. If these are considered after production, adjustments can be expensive and slow.

Confirm how each piece will be fixed, which trades are involved and in what order, and whether any surfaces need protection during construction.

Changing the Design Late

Late changes to dimensions, profiles or finishes often cause the most costly delays. Each change may require a new drawing, a new approval and sometimes new material. Finalizing the design before production keeps the project predictable.

Treat the approved drawing as the reference for the whole project and route all changes through a formal revision with a date and a new approval.

Frequently asked questions

Do I need to measure on site before ordering custom metalwork?

Yes, on-site measurement is strongly recommended because walls and openings are rarely exact. Measuring before production reduces the risk of pieces that do not fit.

What should a written specification include?

It should list materials, profiles, thicknesses, dimensions, finishes, fixings and installation details. Both the client and the workshop should approve it in writing.

Can I change the finish after production starts?

Changing the finish late is usually difficult and can delay the project. Choose the finish before drawing approval whenever possible.

How do I check safety requirements for railings?

Discuss the intended use and loads early and confirm the requirements with the responsible engineer. Israeli standard SI 1142 is relevant, and exact values should be verified rather than assumed.

Common mistakes to avoid

The biggest mistakes are ordering before measuring on site and approving a design without a written specification. Both lead to misfits, rework and delays.

Our recommendation

Measure on site, decide finishes and loads early, and approve a complete drawing and specification in writing before production. Treat that approved document as the single reference for every change.

Summary

Careful measurement, early decisions on finish and safety, and a written approved specification prevent most problems with custom architectural metal.

Send us your drawings and photos and we will help you plan t

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ