Emergency Exit Hardware Quote Request for Architects

t501-46

t501-46

To request a quote for emergency exit hardware, send your door schedule, drawings or photos, and the opening dimensions to Techno Kol Uzi. We confirm the door type, fire and egress requirements, and finish, then return a written specification for your approval before production.

What to Include in Your Quote Request

A complete request lets us respond quickly and accurately. Start with the door schedule or a simple list of openings, marking which doors are exit doors and which are fire-rated. Add plans or elevations showing door width, height, leaf count, and swing direction.

  • Door dimensions and material (steel, aluminum, or glass)
  • Direction of egress and required swing
  • Fire rating and frame type, if applicable
  • Desired finish and any architectural style notes

Photos of existing openings are helpful when the work involves retrofitting or matching existing metalwork.

Understanding Egress Requirements

Emergency exit hardware, often called panic hardware, must allow occupants to leave quickly without keys or special knowledge. The right choice depends on occupancy type, the number of people using the door, and the local code in effect for your project.

Designers should confirm with the project engineer and the relevant authorities how the door must open, the force permitted to release it, and whether additional features such as alarms or delayed egress are required. We review these points with you during the quote stage so the specification matches your approval set.

How Custom Fabrication Fits the Process

Because we manufacture to measure, exit doors and their frames can be built to your exact openings rather than adapted from stock sizes. This is especially useful for heavy steel doors, oversized aluminum openings, and doors that must match a particular architectural profile.

Our work follows a clear sequence: inquiry with photos, on-site measurement where needed, a drawing and written specification, your approval, factory production, finishing, and installation. Each stage gives you a chance to confirm details before material is cut.

Finishes and Coordination on Site

Exit doors are exposed to daily use and often to weather, so finish selection matters. Hot-dip galvanizing and powder coating are common options for steel elements, and they help protect the door against corrosion over time. We can discuss color and texture so the door fits the design intent of the building.

Coordinate hardware location, electrical connections for any alarm or access features, and wall or frame conditions with the other trades early. Sharing this information in your request prevents rework during installation.

Standards and Verification

Safety standards for doors, railings, and egress components are detailed and change over time. Where your project requires specific numeric values, such as dimensions, forces, or clearances, please confirm them against the current code and your engineer's requirements. We will not guess at these figures on your behalf.

For railings and guarding adjacent to exits, the Israeli standard SI 1142 is a useful reference, and your engineer can confirm the exact requirements for your specific installation.

Preparing for Approval and Delivery

Once you approve the written specification, we move the job into production and keep you informed of progress. Please review the drawing carefully, since approval confirms the dimensions, hardware type, and finish we will build.

  • Check door sizes and swing against your plans
  • Confirm fire rating and frame details with your engineer
  • Approve the finish and any alarm or access requirements

Clear approvals at this stage keep installation on schedule and avoid changes after fabrication.

Frequently asked questions

What information do I need to request a quote for emergency exit hardware?

Send your door schedule or a list of openings, along with plans or photos showing dimensions, swing direction, and material. Note any fire rating or finish requirements so we can prepare an accurate specification.

Do you measure the openings on site?

Yes, when needed we visit the site to measure the openings before drawing the specification. Accurate measurements reduce the risk of fit issues after production.

Can exit doors be custom made to match my design?

Yes, we manufacture to measure in steel, aluminum, and glass, so doors and frames can match your architectural profile. Finish options include hot-dip galvanizing and powder coating.

How do I confirm the code requirements for my project?

Confirm egress and hardware requirements with your project engineer and the applicable code in effect for your building. We will align the specification with the requirements you provide.

Common mistakes to avoid

A common mistake is submitting a request without the swing direction, occupancy type, or fire rating, which forces revisions later. Another is approving a drawing without verifying dimensions against the actual openings.

Our recommendation

Send your door schedule and photos at the start, and have your engineer confirm code-driven values before approving the specification. Early coordination on hardware location and electrical needs saves the most time.

Summary

Request your emergency exit hardware quote with a complete door schedule, drawings, and finish notes. We confirm the details in writing so production starts only after your approval.

Send us your door schedule and drawings today to start your

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ