How to Order Handrails for a New Construction Project
t350-35

To order handrails for a new construction project, prepare accurate drawings, confirm the exact locations and dimensions with the site team, and agree on materials and finish before production starts. A written specification and client approval at each stage prevent costly changes later. Handrails are then made to measure in the factory and installed on site once the structure is ready.
Start with the building plans and specifications
A good handrail order begins with the architectural and structural drawings. Check the stair and balcony details, the floor levels, the wall finishes and any load requirements the engineer has noted. Mark every location where a railing is needed, including stairs, landings, balconies, ramps and roof edges.
Ask the design team which style and finish they expect, such as steel, stainless steel or aluminum, so the supplier quotes the right system from the start.
Measure on site before production
Drawings alone rarely show the final situation. Walls can be out of plumb and slabs may settle slightly, so an on-site measurement is essential before the handrails are made. Measure the actual stair pitch, the height from the finished floor, and the position of anchor points.
- Measure at several points along each run
- Record anchor positions and wall materials
- Note any obstacles such as pipes or conduits
Prepare a clear written specification
Put every requirement in writing: profile sizes, infill pattern, handrail type, fixing method and finish. A detailed specification lets the factory price the work accurately and avoids misunderstandings between the developer, contractor and fabricator.
Include drawings or annotated photos wherever possible, and state which items are supplied by others, such as glass panels or concrete anchors.
Approve drawings and finish before manufacturing
After the supplier prepares a drawing, review it carefully against the plans. Check heights, spacing, joint positions and the appearance of welds and finishes. Written client approval is the point at which production can begin, so it should be given only when all parties are satisfied.
Changes made after production starts usually cost more and can delay the schedule, so resolve questions early.
Understand production and finishing steps
Once approved, the handrails are cut, welded and assembled in the workshop, where the work can be controlled more precisely than on site. For exterior projects, hot-dip galvanizing or powder coating protects steel against corrosion and weather. Ask the supplier which finishing process suits the exposure and how long it adds to the schedule.
Plan storage and protection so finished elements stay clean until installation.
Plan installation and compliance checks
Installation should follow the approved drawings and the fixing details provided. Anchors must suit the substrate, and the railing should be checked for alignment, stability and height. Israeli railing requirements are covered by standard SI 1142; confirm the applicable requirements and exact values with your structural or safety engineer rather than relying on general assumptions.
Schedule a final inspection so any adjustments are made before handover.
Frequently asked questions
How far in advance should I order handrails for a new building?
Order once the drawings are stable and the site has been measured, ideally before the structure reaches the stage where railings are fixed. Allow time for drawing approval, production and finishing. Your supplier can advise on lead times for your specific project.
Do I need to measure on site if I have architectural drawings?
Yes. Drawings may not reflect small deviations in the concrete or masonry, and on-site measurement helps prevent fit problems. It is a simple step that often saves rework.
Which material is best for handrails in new construction?
The best choice depends on the location, exposure to weather and the look the architect wants. Steel with galvanizing or powder coating suits many exterior uses, while stainless steel and aluminum are common in other settings.
Who should approve the handrail drawings?
The developer or client should approve the drawings, usually after review by the architect or engineer. Written approval protects everyone and confirms the final specification before production begins.
Common mistakes to avoid
Ordering before drawings and measurements are confirmed, and changing details after production has started, are the most common and expensive errors. Skipping written approval also leads to disputes over finish and dimensions.
Our recommendation
Agree on one reference drawing with the architect, measure the site once everything is structural, and sign off the final drawing in writing before production. This sequence keeps the schedule and budget under control.
Summary
Ordering handrails for new construction works best with confirmed drawings, accurate on-site measurements, a clear written specification and written approval before production. Following these steps leads to handrails that fit, look right and meet the project requirements.
Related guides
- Ordering Handrail Replacements for an Existing Staircase
- Choosing Between Off-the-Shelf and Custom-Made Handrails
- Confirming Handrail Dimensions Before Fabrication Begins
- Drawings and Photos to Send When Requesting a Handrail Quote
- Site Preparation Checklist Before Handrail Installation Day
- What to Include in a Custom Handrail Order Request
- All models in this category
Send us your plans or photos and we will help you prepare a
עוד מדריכים ודפים בנושא
- Off the Shelf vs Custom Handrail: How to Choose
- Drawings and Photos to Send When Requesting a Handrail Quote
- What to Include in a Custom Handrail Order Request
- Handrail Specification Template for Architects and Contractors
- Custom Handrail Lead Time: What Shapes Your Schedule
- Handrail Height Requirements in Israel: A Contractor's Guide
- Handrail Project Budgeting: Structuring Scope and Cost Drivers
- Handrail Color and Coating Options for Exterior Applications
- Handrail End Termination: Finishing Handrail Ends Properly
- Choosing Handrails for Pools and Wet Areas: A Practical Guide