
Office Gate Access Schedule: Limiting Parking Gate Use to Business Hours
t284-20

An office gate access schedule sets specific hours when the electric parking gate opens for vehicles and when it stays closed to general traffic. It is usually built with a timer or access control panel that combines scheduled opening windows with card, code or remote access outside those hours.
Why offices schedule their parking gates
Many office buildings in Tel Aviv share a parking area with residential or mixed-use neighbors, and the gate that works well during the day can become a problem at night. A defined schedule lets the gate open freely for staff and visitors during working hours, then switch to controlled access when the office closes.
Scheduling also reduces wear on the motor, since the gate is not cycling every time a passing car triggers the loop or sensor late in the evening.
Choosing between sliding and swing gates for office use
Electric sliding gates suit buildings with limited space in front of the entrance, because they travel along the wall rather than swinging out. Swing gates work well when there is clear room on the driveway side and when the opening should be wider for larger vehicles or delivery trucks.
- Sliding: space-saving, good for narrow frontages
- Swing: wider opening, needs clearance behind the gate
Either type can be fitted with the same scheduling logic, so the choice should depend on the site layout.
How the schedule is set up
The usual setup combines a time clock in the gate controller with an access method for out-of-hours entry, such as proximity cards, keypad codes or remote fobs. During the scheduled window the gate can stay in open mode, and outside it the gate returns to closed mode and responds only to authorized credentials.
The schedule should be agreed with the office manager before installation, including holidays and any weekend shifts, so the controller can be programmed correctly the first time.
Safety and standards to check
A gate that closes on a schedule must still protect people and vehicles. Safety edges, photocells and proper motor stops are essential, and the installation should follow the Israeli railing and safety guidance, SI 1142, in the parts that apply to the site. Exact measurements and clearances are confirmed with the engineer during the site visit rather than assumed from general rules.
Emergency release and fire service access also need to be planned into the schedule, so the gate never blocks a required route.
Process from inquiry to installation
The work starts with an inquiry and photos of the entrance. We then carry out an on-site measurement, prepare a drawing and a written specification that includes the schedule requirements, and wait for your approval before anything is produced.
- Inquiry with photos
- On-site measurement
- Drawing and written specification
- Client approval
- Production at our Tel Aviv factory
- Finishing with hot-dip galvanizing or powder coating
- Installation and programming of the schedule
Maintaining the schedule over time
Once the gate is running, the office manager should know how to change the hours, add or remove access cards and check that the photocells are clean and unobstructed. A short periodic check keeps the gate reliable, especially after seasonal time changes or staff turnover.
Keeping a simple written record of the schedule and the access list makes future changes faster and reduces the chance of someone being locked out.
Frequently asked questions
Can the gate open automatically during office hours without a card?
Yes, the controller can hold the gate in open mode during the scheduled window so staff and visitors drive in without credentials. Outside those hours it returns to controlled access.
Does a scheduled gate work with both sliding and swing models?
Yes, both electric sliding and swing parking gates can be programmed with the same schedule logic. The right type depends on the space available at the entrance.
What happens if there is a power cut during closed hours?
A proper installation includes an emergency release so people can open the gate manually. Battery backup can also be considered depending on how the site is used.
Who sets the office hours in the controller?
The hours are agreed with the office manager before installation and programmed during commissioning. They can be adjusted later if the office schedule changes.
Common mistakes to avoid
A common mistake is leaving the schedule to default settings without checking holidays or weekend shifts. Another is forgetting emergency access and safety sensors, which can cause problems even when the timing is correct.
Our recommendation
Write the schedule down with the office manager before measuring the site, and include holidays, delivery times and emergency access in that agreement. This prevents most programming changes after installation.
Summary
An office gate access schedule keeps the parking entrance open during working hours and controlled at other times, with safety and emergency access built in from the start.
Related guides
- Visitor Management at Office Parking Gates
- Intercom and Gate Entry for Shared Residential Buildings
- Shop Gate Opening Speed for High Customer Traffic
- Multi-Resident Access Cards and Fobs for Building Gates
- Shop Entrance Safety Sensors for Parking Gates
- Shared Building Gate Remote Control Setup Guide
- All models in this category
Send us photos of your entrance and your office hours, and w
עוד מדריכים ודפים בנושא
- Penthouse Parking Automatic Gate: Sliding and Swing Options
- Intercom and Gate Entry for Shared Residential Buildings
- Access Fobs for Residents: Electric Gates in Multi-Unit Buildings
- Shared Building Gate Remote Control Setup Guide
- Sliding Gate Track Installation for Private Driveways
- Swing Gate Space Requirements for Houses on Slopes
- Driveway Gate Automation Steps for Private Houses
- Penthouse Gate Design Options for Modern Homes
- Garden Apartment Gate Height: Clearance Guidelines
- Gate Width for Apartment Parking Entrances: How to Measure
