
Order a Made-to-Measure Steel Staircase Quote in Israel
t391-4

To order a custom steel staircase, send us photos and the basic dimensions of the space, then we arrange an on-site measurement and prepare a drawing and written specification for your approval. Once you approve the design, we fabricate the staircase to measure in our Tel Aviv factory, finish it, and install it on site.
What You Need Before Requesting a Quote
A clear inquiry helps us understand your project from the first message. Prepare a few photos of the staircase area, the floor levels above and below, and any wall or opening that affects the route. Note the approximate height between floors and the width you have available.
- Photos of the existing opening or space
- Floor-to-floor height if you know it
- Intended use, such as residential, shared building or commercial
- Preferred style, finish and any existing railings to match
Even rough information is useful. We will confirm the exact figures during measurement.
On-Site Measurement
After reviewing your inquiry, we visit the site to measure the space accurately. Factory-made staircases depend on precise dimensions, so measuring on location avoids errors that would be costly to correct later. We check the opening, the floor finish, the wall conditions and the points where the staircase will be fixed.
If the building is still under construction, we can advise on what to coordinate with the contractor before the concrete or finishing work is completed.
Drawing and Written Specification
Once measured, we prepare a drawing showing the layout, dimensions, stringer and tread arrangement, and railing position. A written specification accompanies the drawing and lists the steel profiles, connections, surface treatment and installation method.
What to check on the drawing
Review the step count, the height of the landing, the direction of the stairs and the railing side. Ask questions about anything that is unclear before approving. Changes are simpler at this stage than after production begins.
Client Approval and Production
We do not start production until you approve the drawing and specification in writing. Once approved, the staircase is cut, welded and assembled in our factory on Rival Street in Tel Aviv. Working in the workshop allows us to control the quality of each joint and to produce the parts to the measured dimensions rather than estimating them on site.
Please tell us early if your schedule depends on a specific delivery date, so we can plan the production order accordingly.
Finishing and Safety Considerations
Steel staircases are usually finished by hot-dip galvanizing or powder coating, depending on the exposure and the look you want. Galvanizing gives strong corrosion protection, while powder coating offers a wide range of colors. We will recommend the option that suits the location.
Railing height, baluster spacing and handrail design should follow the Israeli railing standard SI 1142 and the requirements of your project engineer. We confirm the exact values together with the engineer rather than relying on general rules.
Installation on Site
Our team installs the staircase once the finishing is complete and the site is ready. We confirm fixing points, levels and alignment before final fastening. Good coordination with the contractor on the floor finish and wall conditions makes installation smoother and protects the finished surfaces.
After installation we walk through the staircase with you, check the railings and answer any questions about use and care.
Frequently asked questions
Can you make a staircase to any dimensions?
Yes, every staircase is manufactured to measure based on the dimensions we take on site. Exact layout and sizes are confirmed in the drawing before production.
Do I need to send a drawing before requesting a quote?
No. Send photos and the basic space details, and we will prepare the drawing after the on-site measurement.
How do I approve the design?
You review the drawing and written specification, and approve them in writing. We begin production only after your approval.
Do you install the staircase as well?
Yes, our team handles installation on site once the finishing work is ready and the fixing points are confirmed.
Common mistakes to avoid
Ordering before measuring the space and approving a design without checking the step count and railing side are the most common mistakes. Both lead to changes that are far more costly after production has started.
Our recommendation
Measure the opening and floor-to-floor height carefully, and confirm the landing and entry direction before approving the drawing. Have your project engineer check railing values against SI 1142 before final approval.
Summary
Ordering a custom steel staircase is a clear process: inquiry, on-site measurement, drawing and specification, your approval, factory production, finishing and installation.
Related guides
- Spiral Steel Staircase Manufacturing for Tight Spaces
- Steel Staircase Renovation for Apartment Buildings
- Floating Steel Staircase Fabrication and Installation
- Upgrading a Staircase with Steel Stringers and Treads
- Industrial Steel Staircase Manufacturing for Factories
- Replacing an Old Wooden Staircase with a Steel Structure
- All models in this category
Send us photos and the space dimensions today to request you
עוד מדריכים ודפים בנושא
- Steel Staircase Replacement Process and Timeline Explained
- Accessible Steel Staircase Design with Handrails
- Steel Staircase Building Code Compliance in Israel
- How to Measure for a Custom Steel Staircase Correctly
- Steel Staircase Installation Checklist for Site Teams
- Reinforce Steel Staircase for Heavier Loads | Techno Kol Uzi
- Replacing Staircase Stringers with Steel Channels
- Wood-Clad Steel Staircase Upgrade Options for Warm Interiors
- Steel Staircase with Glass Infill Panels: Design Guide
- Checker Plate Steel Staircase Manufacturing in Tel Aviv
