top of page
‹ חזרה

Order Stair Railings for Your Contracting Project

t325-12

t325-12

Contractors can order custom stair railings from Techno Kol Uzi by sending photos and site details, then arranging an on-site measurement. The factory at 37 Rival Street, Tel Aviv, produces each railing to measure and delivers it finished for installation on your job site.

Why Contractors Order Stair Railings From a Specialist Factory

On an active job site, timing and accuracy matter more than almost anything else. A stair railing that arrives with the wrong dimensions can stall the finishing crew for days. Ordering from a manufacturer that works to measure reduces that risk, because each piece is built from the actual site dimensions rather than generic sizes.

Techno Kol Uzi has manufactured iron, aluminum, glass and stainless steel works since 1945 and is run today by the third generation of the family. Contractors working with the factory get a single point of contact for railings, handrails and related metalwork on the same project.

What to Prepare Before You Send an Inquiry

A clear inquiry speeds up the whole process. Gather the information below before you contact the factory, so the first conversation can move straight to measurement.

  • Photos of the staircase from the bottom, the top and the side
  • Rough dimensions of the flight, landing and wall heights
  • The type of railing you need: steel, glass, handrail or a combination
  • The finish you want, such as hot-dip galvanizing or powder coating
  • Your site schedule and the date the railing must be on site

Good photos alone often let the team understand the layout before the visit.

The On-Site Measurement Step

After reviewing your inquiry, the factory arranges an on-site measurement. This is the step that matters most for stair railings, since walls are rarely perfectly straight and floors are seldom perfectly level. Measuring the real staircase captures the slope, the wall offsets and the exact positions of posts and anchors.

Ask that the person measuring also notes any site conditions that affect installation, such as concrete edges, tile thickness or access limits. Clear notes at this stage prevent surprises when the railing arrives.

Drawings and Written Specification

Once the measurement is complete, you receive a drawing and a written specification. Review both carefully before approving. The drawing shows the layout, the height and the fixing points, while the specification lists materials, profiles, finishes and connection details.

Check that the specification matches your architectural plans and any engineering requirements. Where a question arises about structural values, confirm it with your engineer, since exact figures depend on the project and the applicable standard, including the Israeli railing standard SI 1142.

Production, Finishing and Delivery Planning

After you approve the drawing, the railing goes into production in the factory. Steel parts can be hot-dip galvanized for corrosion protection and then powder coated for the final colour and look. Glass and stainless steel components follow their own finishing steps.

Plan delivery around your installation sequence. If the stair is needed before wall finishes or before the balustrade crew arrives, agree on the delivery window early so the factory and your site team stay in step.

Installation Coordination on Your Site

Installation is simplest when the railing crew and your site team agree on responsibilities in advance. Confirm who handles anchor placement, whether the fixing points are cast in or drilled, and who checks alignment before final fixing.

  • Verify the fixing points match the approved drawing
  • Keep the stair clear and protected during other trades
  • Inspect the railing for alignment and secure fixings before handover

A short walkthrough at the end helps you record the work as complete.

Frequently asked questions

How long does it take to order a stair railing for a site?

The timeline depends on the project, the measurement schedule and the production queue. Share your site deadline in the first inquiry so the factory can plan the measurement and production around it.

Do I need to send drawings with my inquiry?

Drawings are helpful but not required. Photos, rough dimensions and a description of the staircase are enough to start, and the factory produces a measured drawing after the site visit.

Can the railing match the design of other metalwork on the project?

Yes, the factory manufactures to measure and can align the railing style, profiles and finish with other iron, aluminum or stainless steel elements on your project.

Who checks that the railing fits the staircase?

The on-site measurement is carried out before production, and the drawing is approved by you before manufacturing begins. This is the main checkpoint for fit.

Common mistakes to avoid

Ordering before the staircase is fully framed or measured often leads to dimension errors that cost time on site. Skipping the drawing approval step can also mean a railing that does not match the layout you planned.

Our recommendation

Measure the staircase after the structure is complete and before wall finishes are applied, then send that measurement with photos to the factory. Approve the drawing in writing so there is a clear record of the agreed height, profile and fixing points.

Summary

Contractors can order custom stair railings from Techno Kol Uzi through a clear process: inquiry, on-site measurement, drawing, production and installation coordination. Preparing photos and site dates early keeps your project moving.

Send us your staircase photos and site timeline to start you

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ