top of page
‹ חזרה

Ordering Gates for Public Institutions: Steps and Requirements

t269-49

t269-49

A public institution orders a gate by sending an inquiry with photos, followed by an on-site measurement, a written drawing and specification, and client approval before production begins. The gate is then manufactured to measure at our Tel Aviv factory, finished, and installed. Clear requirements at the start, such as access type, dimensions and finish, keep the process smooth.

Why institutions need a structured ordering process

Schools, community centers, clinics, religious institutions and residential building committees often need gates that must meet practical, safety and budget-approval requirements. Unlike a simple household purchase, the decision usually involves several people, from a facilities manager to a committee or a contractor.

A structured process helps everyone agree on what is being built before any metal is cut. It also creates a written record that can be shared with the board or committee for approval.

Step 1: Initial inquiry with photos

Start by sending a short description of the location and purpose of the gate, together with clear photos of the existing opening or the area where the gate will stand. Mention whether the gate is pedestrian, vehicular, or both, and whether it must be manual or electric.

  • Photos from the street side and the inside
  • Approximate opening width and height
  • Intended use and expected traffic

Step 2: On-site measurement

Our team visits the site to measure the opening, check the ground conditions, and note any existing posts, walls or wiring. Accurate measurement is the foundation of a gate that fits properly and operates smoothly. Measuring from photos alone is rarely enough for an institutional project.

Where an electric operator is planned, we also check the power supply location and the clearance needed for the leaf to swing or slide.

Step 3: Drawing and written specification

After the measurement, we prepare a drawing and a written specification covering dimensions, profile type, infill, hinges or sliding track, locking arrangement, finish and installation method. This document is what your committee or contractor will review and sign off.

Please check the specification against your own requirements, and ask your structural or safety engineer to confirm any values that depend on local regulations, since exact figures should be verified with the engineer for each project.

Step 4: Client approval and production

Once the drawing and specification are approved in writing, production starts in our factory. Each gate is manufactured to measure, cut, welded, and assembled on our workshop floor before it leaves for site. Approval in writing protects both sides and avoids changes later that cost time.

Any change requested after production has begun should be raised immediately so it can be assessed properly.

Step 5: Finishing and protection

Gates for outdoor institutional use need proper surface protection. Common finishes include hot-dip galvanizing followed by powder coating, which gives long-lasting corrosion resistance and a consistent color. Choose the finish together with the specification so it is included in the approved document.

Step 6: Installation and handover

Our team installs the gate on site, fixes it to the posts or wall, and checks that it opens, closes and locks correctly. For electric gates, the operator, safety sensors and controls are tested before handover. We recommend a walk-through with the facilities manager so the operating instructions are clear to everyone who will use the gate.

Frequently asked questions

How long does the ordering process usually take?

The timeline depends on the complexity of the gate, the approval speed of your committee, and the finish selected. We recommend allowing time for the drawing and approval stages before the production date is planned.

Do we need an engineer for an institutional gate?

For many institutional projects, yes. An engineer can confirm structural loads, safety requirements and any values that apply to your specific site, so the approved specification is complete.

Can we request changes after the drawing is approved?

Changes are possible, but they should be raised before production starts. Changes made later can affect the schedule and the finished work, so we ask for all requirements to be confirmed at the approval stage.

What information should we prepare before contacting us?

Prepare photos of the opening from both sides, approximate dimensions, the intended use, and whether the gate needs to be electric. Having a named contact person for approvals also helps the process run smoothly.

Common mistakes to avoid

Institutions often approve a drawing without checking the finish, operating method or power supply, which leads to costly changes on site. Review every line of the specification before signing.

Our recommendation

Put all requirements in writing at the inquiry stage, including access type, dimensions, finish and electrical needs, and have one person responsible for approvals. This keeps the committee, contractor and manufacturer working from the same document.

Summary

Ordering a gate for a public institution works best when you follow the steps: inquiry with photos, on-site measurement, approved drawing and specification, factory production, finishing and installation.

Send us photos and a short description of your site, and we

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ