top of page
‹ חזרה

Stainless Steel Elevator Panel Fitting: Process from Measure to Install

t474-32

t474-32

Stainless steel elevator panel fitting is a planned sequence: on-site measurement of the cab, a written drawing approved by the client, factory production of the panels, and then installation inside the lift. Following these steps in order prevents fit problems and reduces disruption to residents.

Why Panel Fitting Starts with an Accurate Site Survey

Every lift cab is slightly different, so panels are never made from a generic size. A technician measures the cab walls, ceiling, existing trim, door opening and any uneven surfaces while the lift is available. Photos of each wall are taken alongside the numbers so nothing is lost between visit and factory.

Building managers can help by arranging access to the lift and confirming whether the cab is in service during the survey. Noting any existing damage or protruding fixtures at this stage avoids surprises later.

Drawing, Specification and Client Approval

From the measurements, a drawing is prepared showing each panel, its dimensions, the stainless steel grade, surface finish such as brushed or mirror, and how panels join at corners. A written specification accompanies the drawing so the building committee knows exactly what is being produced.

  • Check panel layout against the existing cab lighting and buttons
  • Confirm the finish matches the rest of the lobby
  • Approve the drawing in writing before production starts

Factory Production of Stainless Steel Panels

Once approved, the stainless steel sheets are cut, bent and formed in the workshop to the drawing. Edges are deburred and the surface is finished to the agreed look. Because panels are made to measure, parts are checked against the drawing before they leave the factory to reduce adjustments on site.

Protective film is kept on the panels during handling so the finish stays clean for installation day.

On-Site Fitting Inside the Lift Cab

Installation is usually done with the lift out of service for a short period. The old panels are removed carefully, the wall surface is checked and any fixings are prepared. Each new panel is positioned, aligned and secured, with attention to gaps at the corners and around the buttons and handrail.

Fitters test that panels sit flat and that doors and controls are not obstructed before the lift returns to use.

Safety and Standards Checks

Panels inside a lift must not interfere with doors, emergency controls, ventilation or the cab's fixed equipment. Where handrails or grab bars are part of the upgrade, they should be checked against the Israeli railing standard SI 1142 in general terms, and exact dimensions confirmed with the responsible engineer.

A final visual and functional check at the end of the job confirms the lift is ready for use.

Planning the Schedule with Building Residents

Good planning keeps disruption low. Managers usually agree on a window with the lift company, notify residents in advance and arrange a backup route for the building. Ordering after the drawing is approved means production can run while other preparations are completed.

  • Set the installation date with the lift maintenance company
  • Post notices a few days ahead
  • Plan for stairs or temporary access if needed

Frequently asked questions

Do you need to measure the lift cab in person?

Yes, an on-site measurement is needed so the panels fit the real cab walls, not just the plans. Photos are taken alongside the measurements.

Can I choose the stainless steel finish?

Yes, the finish such as brushed or mirror is selected at the drawing stage and written into the specification before production.

How long does the lift stay out of service?

The downtime depends on the cab and the scope of the job, so the exact window is agreed with the lift company when the schedule is planned.

Do panels need to meet safety standards?

Panels must not block doors, controls or emergency equipment. Handrails are checked against the Israeli standard SI 1142 in general terms, with exact values confirmed by the engineer.

Common mistakes to avoid

Ordering panels from plans without a site measurement, or approving a drawing without checking the finish and control layout, often leads to refitting. Skipping the written approval step is another common cause of delays.

Our recommendation

Ask for photos and a written drawing before production, and confirm the finish against the lobby in person. Schedule the installation with the lift company early so the downtime is short and residents are informed in advance.

Summary

Accurate measurement, an approved drawing, careful factory production and planned on-site fitting together give a clean stainless steel elevator panel upgrade with minimal disruption.

Send us photos and the lift cab size, and we will arrange a

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ