
What Happens After You Order Steel-Look Windows?
t436-45

After you place an order for steel-look windows, the factory first confirms the measurements on site and prepares a drawing and written specification for your approval. Once you approve, the windows are manufactured in the Tel Aviv factory, finished, and then installed at your property. Each stage is confirmed with you before the next one begins.
Step 1: Inquiry and Photos
Your first contact can be simple. Send photos of the openings you want to fill, along with a rough idea of the number of windows and doors and where they are located in the building. Photos from several angles help the team understand the surroundings, the wall type, and any existing frames.
At this stage you do not need exact dimensions. The team uses your photos and notes to decide whether an on-site visit is the next step.
Step 2: On-Site Measurement
A representative visits the property to measure every opening carefully. Accurate measurements matter because steel-look profiles are made to fit your exact space, not to a standard size.
- Width and height of each opening, taken at more than one point
- Wall material and depth of the frame recess
- Direction of opening and any obstacles nearby
Step 3: Drawing and Written Specification
After measuring, the team prepares a drawing of each window and door, along with a written specification. The specification describes the profile style, the opening type, the glazing, the colour, and the finish. Reading it carefully is important, because it becomes the reference for what will be built.
If anything looks different from what you imagined, say so now. Changes are much easier to make before production starts.
Step 4: Your Approval
You review the drawings and the specification and confirm them in writing. This approval is the point where the order is locked in for production. Check the dimensions, the number of units, the opening directions, and the finish once more before you sign off.
Ask questions freely. A clear understanding at this stage prevents misunderstandings later on.
Step 5: Production and Finishing
Once approved, the windows and doors are manufactured in the factory on Rival Street in Tel Aviv. The profiles are cut, assembled, and fitted with the glazing and hardware specified in your order. Finishing steps such as hot-dip galvanizing or powder coating are applied to protect the steel and give the final appearance you chose.
The team keeps you informed as the order moves through each stage of production.
Step 6: Installation
When the units are ready, they are delivered and installed at your property. Installation includes fixing the frames, adjusting the opening and closing, and sealing the edges so the windows operate smoothly and keep out weather.
Before the team leaves, check that each window and door opens, closes, and locks as expected. Raise any issue immediately so it can be corrected on the spot.
Frequently asked questions
How long does the whole process take?
The timeline depends on the number of openings, the finish chosen, and how quickly approvals are given. Your contact at the factory can give you a realistic estimate once the specification is confirmed.
Can I change the design after I approve the drawings?
Changes after approval may affect production and should be discussed with the team before manufacturing begins. The earlier you request a change, the easier it is to accommodate.
Do I need to be home during measurement and installation?
It is best to be present or to arrange access with someone who can make decisions. Being there allows you to confirm the openings and check the result directly.
What should I check when the windows are installed?
Check that every window and door opens, closes, and locks properly, and that the edges are sealed. Report any problem before the installation team leaves.
Common mistakes to avoid
Many first-time buyers approve drawings too quickly without checking dimensions and opening directions. Taking a few extra minutes to review the specification carefully can prevent costly corrections later.
Our recommendation
Mark every opening on a simple sketch and note which way each window should open before the measurement visit. Compare this with the drawing when it arrives, and confirm anything that differs before you approve.
Summary
Ordering steel-look windows follows a clear path: inquiry, on-site measurement, drawing and specification, your approval, factory production with finishing, and installation. Each step is confirmed with you before moving on.
Related guides
- Do You Offer Installation Services Along With Steel-Look Windows?
- Can I See Steel-Look Window Samples Before Deciding?
- How Can I Book a Consultation for Steel-Look Doors?
- What Do I Need to Send You to Get a Steel-Look Window Estimate?
- What Payment Terms Apply to Steel-Look Window Orders?
- Can I Order Steel-Look Doors Online and Have Them Delivered?
- All models in this category
Send us photos of your openings and we will guide you throug
עוד מדריכים ודפים בנושא
- Can I See Steel-Look Window Samples Before Deciding?
- What to Send Us for a Steel-Look Window Estimate
- Can You Order Steel-Look Doors Online in Israel? A Clear Answer
- How to Request a Free Site Visit for Steel-Look Windows
- Steel-Look Window Lead Time: What to Expect Before Delivery
- Will Steel-Look Window Frames Rust Over the Years?
- How to Measure Openings for Steel-Look Windows
- What a Steel-Look Window Quote Should Include
- Steel-Look Windows vs Other Frames: How the Cost Compares
- Can Steel-Look Windows Be Fitted to Old Heritage Buildings?
