Aluminum Window Supply and Installation for Developers
t400-32

A bundled aluminum window supply and installation service means one manufacturer measures, designs, produces, and fits every window in your project. This keeps dimensions, specifications, and schedules under one responsibility, which reduces site conflicts and delays.
Why Developers Choose a Bundled Service
When windows are bought from one supplier and installed by another, every gap in responsibility becomes a question nobody wants to answer. Who checked the opening dimensions? Who corrected the frame that arrived 10 mm too wide? A bundled service puts those answers in one place.
For developers managing several floors or units, this approach also simplifies scheduling. Measurement, production, and installation follow a single plan, so the building envelope closes on time and finishing trades can start without waiting on a second contractor.
From Measurement to Drawing
The process starts with an on-site measurement of every opening, because drawings alone rarely match the built structure exactly. We record dimensions, reveal depths, and site conditions, then prepare a drawing and a written specification.
The specification covers profile type, glazing, opening direction, hardware, and finish. You review and approve it before any material is cut, which keeps changes cheap and early.
Production in Our Factory
Aluminum windows are manufactured to measure at our factory at 37 Rival Street, Tel Aviv. Working in-house means the same team that drew the window also cuts, assembles, and checks it.
- Profiles cut and joined to the approved drawing
- Glazing fitted and sealed
- Finish applied and inspected before dispatch
On-Site Installation and Sealing
Installation is carried out by our own crew, so the people fixing the frames are the same people who measured them. Each unit is levelled, plumbed, and fixed to the structure, then sealed against air and water.
Sealing and fixing details matter as much as the frame itself. We check junctions with the wall and the waterproofing layer so that the window performs as intended once the building is occupied.
Coordinating With Architects and Contractors
A bundled service still has to fit into the wider project. We share drawings with architects and interior designers early, and we coordinate installation windows with the main contractor so that frames are fixed at the right stage of construction.
What we agree upfront
Delivery sequence, access to floors, protection of finished surfaces, and who signs off each stage. Clear agreement on these points prevents most site friction.
Checks Before Handover
Before handover we check every opening against the approved drawing. We test opening and closing action, confirm that hardware runs smoothly, and inspect glazing and seals for defects.
Any issue found during the walkthrough is corrected by our crew, so the developer receives one set of completed units rather than a list of items to chase across several contractors.
Frequently asked questions
Do you handle both the supply and the installation?
Yes. We manufacture the aluminum windows to measure and install them with our own crew, so one team is responsible from measurement to handover.
When should we involve you in the project?
Ideally during the design phase, so we can take measurements and coordinate drawings before structural openings are finalized. Early involvement reduces the risk of dimensional mismatches.
Can you work with an architect's drawings?
Yes. We review the architect's drawings, verify them against the measured openings, and raise any discrepancies before production begins.
Who approves the window specification?
The developer or their representative approves the drawing and written specification before production starts. Nothing is manufactured until that approval is given.
Common mistakes to avoid
Ordering windows from drawings without on-site measurement is a common error that leads to frames that do not fit. Splitting supply and installation between two parties also causes disputes over who is responsible for gaps and damage.
Our recommendation
Involve the window supplier before the structural openings are finalized and insist on on-site measurement plus an approved specification. Agree the installation sequence with the main contractor in writing.
Summary
A bundled aluminum window supply and installation service gives developers one accountable team from measurement to handover. Early coordination and approved specifications keep the project on schedule and on dimension.
Related guides
- Sliding Aluminum Door-Window Combinations for Villa Terraces
- Custom Color Matching for Aluminum Window Frames to Architectural Plans
- Aluminum Window Frames for Modular Prefabricated Homes
- Warranty Terms to Ask About When Buying Aluminum Windows
- Aluminum Window Shipping Protection and Packaging Standards
- Aluminum Window Lead Times for Bulk Residential Projects
- All models in this category
Send us your floor plans and photos, and we will arrange an
עוד מדריכים ודפים בנושא
- Custom Color Matching for Aluminum Window Frames to Architectural Plans
- Aluminum Window Warranty Terms: Questions to Ask Before You Buy
- Sliding Aluminum Windows for Balcony Enclosure: Key Design Choices
- Aluminum Window Lead Times for Bulk Residential Orders
- Security Locking Points on Aluminum Windows for Ground Floor Units
- Commercial Aluminum Curtain Wall Windows for Office Floors
- Aluminum Pivot Windows for Tall Stairwell Openings
- Custom Aluminum Window Shapes: Arched, Triangular and Circular
- Aluminum Window Rough Opening vs Frame Size: How to Measure
- Sealant Selection for Aluminum Window Perimeter Joints