top of page
‹ חזרה

Building Committee Guide to Electric Parking Gates

t283-21

t283-21

A building committee choosing an electric gate for a residential complex should compare sliding and swing designs based on the available space, the driveway slope and the number of daily vehicles. The committee should then agree on a written specification, check that the gate meets safety requirements, and approve the work only after an on-site measurement and a detailed drawing.

Start with the space and the daily traffic

Before comparing designs, the committee should walk the entrance and note how much room is available on both sides of the gate. A sliding gate needs a clear track length alongside the opening, while a swing gate needs free space in front of or behind it to open fully. Ask how many vehicles enter and leave at peak hours, because a gate that opens and closes often needs a sturdier motor and a faster response.

  • Measure the opening width and the clear space on each side
  • Check the driveway slope and the surface condition
  • Note peak entry and exit times

Sliding or swing: which suits your complex

Sliding gates suit entrances with limited space in front of the gate, because they run sideways along a track and do not swing into the driveway. Swing gates suit wider entrances with room to open, and they are often lighter to operate. Neither option is better in every case, so the choice should follow the site measurements rather than habit or appearance alone.

Both types can be designed in the same style, so the decision can focus on function and fit.

Safety and the building regulations

An electric gate must protect people and vehicles, especially children and pedestrians who may walk near the moving leaf. Safety features such as obstacle detection, safe reversing and clear signage are normal expectations in a shared residential setting. For railings and guarding elements that accompany the entrance, the Israeli standard SI 1142 is a useful general reference, but exact dimensions and requirements should be confirmed with the project engineer rather than assumed.

Materials and finishing for a shared entrance

A gate at a residential entrance is exposed to weather, road dust and daily wear, so the material and finish matter as much as the design. Hot-dip galvanizing protects the steel frame from rust, and powder coating gives a durable colour that resists fading. The committee should ask which finish is proposed for each part of the gate and how the joints and fixings are protected.

How a building committee should run the approval

A clear decision process protects the committee and the residents. Start with a written inquiry that includes photos of the entrance, then arrange an on-site measurement. The factory should then provide a drawing and a written specification that list the gate type, dimensions, materials, finish, motor and safety devices. The committee approves the specification in writing before production begins, which avoids disagreements at installation.

Installation, handover and maintenance

Ask who is responsible for the foundation, the electrical connection and the final testing, and make sure these tasks are named in the agreement. At handover, the committee should receive instructions for the remote controls and the emergency manual release, and a short schedule for inspecting moving parts. Regular checks of the hinges or rollers, the track, and the safety sensors keep the gate reliable for years.

  • Confirm who handles the foundation and electrics
  • Request operating and emergency instructions in writing
  • Agree on a routine inspection schedule

Frequently asked questions

Is a sliding gate or a swing gate better for a residential complex?

It depends on the entrance. Sliding gates suit tight spaces, while swing gates suit entrances with free room to open.

Who should measure the entrance before the gate is designed?

The manufacturer should carry out an on-site measurement, since the final drawing depends on exact dimensions and the site conditions.

Should the committee approve a written specification?

Yes. A written specification and drawing approved before production prevent misunderstandings about size, finish and safety features.

Do safety requirements apply to residential electric gates?

Yes, safety features such as obstacle detection are important in shared spaces, and exact requirements should be confirmed with the engineer.

Common mistakes to avoid

Choosing a design by appearance before measuring the space is the most common error, which can leave a gate that cannot open fully. Accepting verbal agreements instead of a written specification also leads to disputes after installation.

Our recommendation

Request an on-site measurement, a drawing and a written specification, and have the committee approve them in writing before production starts. Ask for a clear list of who is responsible for the foundation, electrics and final testing.

Summary

A well-planned electric gate starts with measuring the space, choosing the right sliding or swing design, and approving a written specification that covers safety, finish and installation responsibilities.

Send us photos of your entrance and we will arrange an on-si

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ