
Do You Need a Site Visit Before Ordering a Gate?
t268-31

In most cases, yes: a site visit is needed before ordering a gate made to measure, because the exact opening, ground slope, posts and surroundings determine the design and fit. Skipping it risks a gate that does not close, sits on the wrong level or clashes with the entrance. Off-the-shelf gates may need less, but custom gates almost always benefit from on-site measurement.
Why a Gate Needs Measuring On Site
A gate is only as good as the opening it fills. Photos help us understand the style you want, but they cannot show the true width between posts, whether the wall is plumb, or how the ground falls across the entrance. Small differences of a few centimeters can decide whether a swing gate clears the pavement or whether a sliding gate runs smoothly along its track.
An on-site measurement records every dimension we need before any drawing starts, so the gate is built to the real opening rather than an estimate.
What Happens During the Site Visit
During the visit we usually check the following:
- The clear width and height of the opening
- The condition and position of posts, walls and pillars
- Ground slope, surface type and clearance under the gate
- Available space for swing or sliding movement
- Electrical supply and cable routes if automation is planned
We also discuss your preferred design, materials and finish while we are there.
When a Site Visit Can Be Skipped
A visit may be unnecessary when you are replacing an existing gate of the same size and type, and you can supply accurate measurements yourself. Simple pedestrian gates in a standard opening are another case. Even then, a quick check of the posts and ground helps avoid surprises, and you should confirm every figure in writing before production begins.
How the Visit Connects to the Written Specification
The measurements gathered on site feed into a drawing and a written specification. You review these and approve them before anything is manufactured. This step is important: it is the point where you can correct a detail, change a finish or confirm the swing direction.
Approval protects both sides. Production starts only once the specification matches what you expect to receive.
Common Reasons Gate Orders Go Wrong
Most problems trace back to information gathered too quickly. Typical examples include measuring only the gap and ignoring that the posts are out of line, forgetting the thickness of a floor finish that later reduces clearance, or choosing a swing gate where a sliding one was needed because a tree or wall blocks the arc.
A careful visit catches these issues before they become expensive corrections.
Preparing for Your Site Visit
To make the visit efficient, have a few things ready:
- Photos of the current entrance, from the street and from inside the yard
- Any existing drawings or old gate details
- A note of how you use the entrance, for cars, pedestrians or both
- Access arrangements, so we can reach the opening comfortably
Clear information at the start shortens the process and improves the final result.
Frequently asked questions
Can I order a gate from photos alone?
Photos are useful for choosing a style, but they cannot reliably show exact dimensions, ground levels or the condition of posts. For a made-to-measure gate, an on-site measurement is strongly recommended.
How long does a site visit take?
The length depends on the size and complexity of the entrance and whether automation is planned. A typical gate visit is a focused appointment rather than a full-day job.
Do I need to be home during the visit?
It helps if someone who can make decisions about the design is present. We can discuss options and confirm details on the spot, which saves time later.
What happens after the measurements are taken?
We prepare a drawing and written specification for your review. Production begins only after you approve it, so you can check everything before the gate is made.
Common mistakes to avoid
Ordering based on an estimate or a photo alone is the most frequent error, along with ignoring ground slope and post alignment. Both can lead to a gate that does not fit or operate properly.
Our recommendation
Book the site visit before deciding on the final style, and bring photos and any old documents. Confirm every dimension and the swing or slide direction in the written specification before approving production.
Summary
For a custom gate, a site visit is generally the right first step, since it captures the real opening and conditions that determine a correct fit. Approving a written specification afterwards keeps the order accurate.
Related guides
- What warranty should I expect on a metal gate?
- Do you install gates or only supply them?
- Can you repair a damaged gate instead of replacing it?
- What questions should I ask a gate manufacturer before buying?
- How do I order a replacement part for my existing gate?
- Can I order a gate in a custom size and finish?
- All models in this category
Contact us to arrange an on-site measurement for your gate.
עוד מדריכים ודפים בנושא
- Do You Install Gates or Only Supply Them? Our Answer
- Can You Install a Sliding Gate on a Sloped Driveway?
- Questions to Ask a Gate Manufacturer Before You Buy
- Can You Order a Gate in a Custom Size and Finish?
- How Long Does a Custom Gate Take to Make?
- How to Measure Gate Opening Correctly Before You Order
- What Kind of Gate Works for a Narrow Side Alley?
- Can a Gate Be Made to Match Your Existing Fence Style?
- How to Make a Gate Harder to Climb Over
- Do You Need Backup Power for an Electric Gate?
