top of page
‹ חזרה

Glass Partition Track and Rail Planning for Designers

t432-28

t432-28

A glass partition track system is the overhead or floor rail that guides sliding glass panels, and its layout must be planned before any glass is cut. Correct planning covers the sliding path, panel overlap, stacking space and the structure that carries the load. Techno Kol Uzi measures on site, drafts the track layout and produces the rails and glass to match.

Why the Track Layout Comes First

In a glass partition, the track decides how every panel moves, where it stops and how much wall or floor space it uses. Choosing the glass thickness or the finish before the rail path is fixed often leads to rework. Start by defining what the partition must do: open fully, close fully, or leave a fixed section in place.

Plan the track as part of the architecture, not as a late addition. Check the ceiling or beam capacity, the floor finish and the position of lighting and ducts before drawing the rail line.

Measuring the Opening On Site

Our measurement visit records the exact opening width and height, the ceiling level at each end, and any slope or unevenness in the floor. Measure at several points, because older buildings rarely have perfectly straight walls.

  • Clear opening width at top, middle and bottom
  • Ceiling or beam height and material
  • Floor level and finish thickness
  • Position of doors, sockets and obstacles

These readings feed the drawing and the panel dimensions.

Sliding Path and Panel Overlap

Each panel needs a clear run along the track, and adjacent panels overlap so the partition closes tightly. Decide how many panels slide, which direction they travel and where they park when open. The stacking zone must be wide enough to hold all panels without blocking a doorway or furniture.

Sliding systems should run smoothly by hand. Ask the designer to confirm the desired opening so the track length and the parking area can be calculated together.

Production in the Workshop

Once the drawing and specification are approved, rails and fittings are cut and prepared in our Tel Aviv factory, and the glass panels are cut to the measured sizes. Metal parts receive the agreed finish, such as hot-dip galvanizing or powder coating, before assembly. Working in the factory lets us check alignment and fit before anything reaches the site.

Checks before delivery

Each rail is checked for straightness, each panel for size and edge finish, and the full set is laid out to confirm the sliding path.

Installation and Alignment

On site, the rail is fixed to the ceiling or floor structure first, then leveled and aligned along its full length. Panels are hung, adjusted for height and gap, and tested through their full travel. Stoppers and soft-close fittings are set at the ends of the run.

Schedule installation after the wet trades and floor finishing, so the track is not exposed to dust or damaged by later work. Confirm load-bearing points with the structural engineer before fixing anything heavy.

Coordinating With the Designer and Engineer

Good results depend on clear handover between the designer, the engineer and the fabricator. Share the layout drawings, the finish schedule and any loading information early. For load values and safety requirements, rely on the structural engineer's calculations rather than general figures.

We provide written specifications so every party signs off on the same dimensions before production starts.

Frequently asked questions

Can a glass partition track be fixed to a suspended ceiling?

Usually not on its own, because suspended ceilings rarely carry sliding loads. The fixing must reach the main structure or a reinforced support, which the engineer should confirm.

How much space should be left for the panels when they are open?

The stacking zone depends on panel width and number of panels, so it is calculated from the drawing. We recommend confirming it on site before the layout is final.

Do I need to decide the glass thickness before the track?

Ideally no, since the track path and fittings can influence the suitable glass. Discuss the design with us first so the thickness and track are chosen together.

Can the partition be changed to a fixed section later?

It can, but planning for a fixed panel from the start is simpler and cleaner. Mention any possible future change during the measurement visit.

Common mistakes to avoid

Ordering glass before the track path is confirmed is the most common error, leading to panels that cannot park or overlap correctly. Skipping floor level checks can also cause the panels to drag or misalign.

Our recommendation

Mark the full sliding path and parking zone on the floor with tape before ordering anything, then walk the route with the designer. This simple check catches most layout problems early.

Summary

Plan the track path, panel overlap and parking zone first, then measure, produce and install in that order. Clear coordination between designer, engineer and fabricator keeps the project on schedule.

Send us photos and your opening dimensions, and we will arra

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ