Protecting Parking Barrier Arms During Construction Work Nearby
t460-31

Protecting parking barrier arms during construction means planning the work zone before it starts, marking and guarding the barrier and its arm, and agreeing on a clear access plan with the site team. When a barrier is damaged or must be relocated, a custom-made replacement can be measured, produced and installed in our Tel Aviv factory process.
Why barrier arms get damaged near construction sites
Parking barrier arms are long, light and often sit exactly where cranes, delivery trucks and excavators need room to turn. Most damage happens during material deliveries, when a crane swing or a tall load clips the arm, or when the barrier is simply in the way and gets bent or pulled out of its base.
Knowing these risk points early lets the contractor plan around them instead of reacting after a collision.
Planning the work zone before the first machine arrives
A short planning meeting between the contractor, the building committee and the barrier owner saves a lot of trouble. Agree on which barrier stays in service, which is temporarily removed, and where delivery trucks will wait.
- Mark the barrier and its arm area with clear tape or cones
- Set a fixed delivery window and route for heavy vehicles
- Name one person on site responsible for barrier access
Protecting the barrier while work continues
Temporary protection is usually enough for the duration of the works. Physical guards placed around the base and the arm path stop most accidental impacts, and a simple sign reminds drivers and workers that the barrier is in use.
If the arm must stay operational, confirm that the controller and cabling are not exposed to dust, vibration or water from concrete work.
Measuring and specifying a replacement barrier
If a barrier arm is damaged beyond repair, a custom replacement is often the best route. Our team visits the site, takes measurements of the opening, the arm length, the base position and the mounting surface, and checks how the arm will clear the lane.
The result is a written drawing and specification that the client approves before production starts. Details such as arm profile, finish and control integration are confirmed at this stage.
Production and finishing in our factory
Once approved, the barrier is manufactured in our Tel Aviv workshop at 37 Rival Street. Steel parts are cut and welded to the drawing, then finished with hot-dip galvanizing or powder coating so they resist weather and handling knocks.
Because the work is made to measure, the arm length, base plate and counterweight match the actual site rather than a standard catalog size.
Installation and handover after the construction works
Installation is scheduled for after the heavy works are finished, or at a quiet time agreed with the site manager. The base is anchored, the arm is aligned and balanced, and the barrier is tested for smooth movement through a full cycle.
Before handover, we walk through the operation with the building manager and confirm that the barrier opens and closes cleanly.
Frequently asked questions
Can a barrier stay in service during construction?
Often yes, if the work zone is planned and the barrier is guarded. The key is agreeing on access routes and protecting the base and arm path from heavy equipment.
What should a contractor do if a barrier arm is hit?
Stop the affected work, secure the area and inform the building committee. Then arrange a site visit so the damage can be assessed and a repair or replacement planned.
How long does it take to replace a custom barrier?
The timeline depends on the site measurement, approval and production schedule. We confirm the timing with the client after the on-site visit and written specification.
Do you measure on site before quoting a replacement?
Yes. Every custom barrier starts with an on-site measurement and a written specification, which the client approves before production begins.
Common mistakes to avoid
Waiting until after the first collision to plan protection is the most common error. Relying on verbal agreements instead of a marked work zone and a written access plan also leads to repeated damage.
Our recommendation
Schedule a short meeting before heavy works begin, mark the barrier area clearly, and keep one named contact responsible for barrier access. Good planning costs far less than an emergency replacement.
Summary
Plan the work zone, guard the barrier, and involve a metalwork specialist early if replacement becomes necessary. Custom measurement and factory production make the new barrier fit the site properly.
Related guides
- Routine Inspection Steps for Parking Barrier Maintenance
- Installation Timeline for Parking Barriers in Commercial Sites
- Lubricating and Adjusting Parking Barrier Mechanisms
- Training Staff to Operate a Newly Installed Parking Barrier
- Replacing a Parking Barrier Spring Step by Step
- Testing Parking Barrier Response Time After Installation
- All models in this category
Contact us for an on-site measurement and a written specific
עוד מדריכים ודפים בנושא
- Parking Barrier Installation Timeline for Commercial Sites
- How Ground Slope Affects Parking Barrier Planning
- Training Staff to Operate a Newly Installed Parking Barrier
- Testing Parking Barrier Response Time After Installation
- Parking Barrier Commissioning Checklist for Facility Managers
- Setting Open and Close Limits on a Parking Barrier
- Installing Safety Loops and Sensors for Parking Barriers
- Connecting Access Control Readers to a Parking Barrier
- Parking Barrier Controller Wiring: Installation Guide for Electricians
- Mounting the Barrier Arm: Alignment and Balance Steps