top of page
‹ חזרה

Replacing Old Windows with Belgian Steel-Look Profiles at Home

t434-47

t434-47

Replacing old windows with Belgian steel-look profile windows lets you keep the slim, industrial appearance of steel while gaining modern sealing and better insulation. The work is best done after an on-site measurement, with a written specification approved before production begins. Done correctly, the new frames fit the existing openings and can be finished to match the rest of your home.

Why owners of older apartments choose steel-look profiles

Many older apartments in Israel still have aluminum or early PVC windows with thick frames, worn seals and a dated look. Steel-look profiles offer a different aesthetic: narrow sightlines, sharp corners and a clean, modern finish that suits both classic and contemporary interiors.

Owners usually want three things at once: a fresh appearance, fewer drafts and less noise from the street. Belgian steel-look systems are designed to address all three, which is why they are a popular choice for upgrading existing homes rather than building new ones.

Assessing your existing openings before you start

The first step is a careful look at what you already have. Check whether the frames are damaged, whether the wall around them shows moisture, and whether the openings are square. Old walls are rarely perfectly straight, so the condition of the opening matters as much as the age of the window.

  • Note the size and number of each opening
  • Check for cracks, damp patches or loose plaster
  • Identify which windows face the street or the sun

The measurement and specification stage

A technician visits the apartment to measure every opening on site. Measuring by photo alone often leads to mistakes, especially in older buildings where the walls vary. The measurements feed into a drawing and a written specification that describes the profile, the glazing, the opening direction and the finish.

Review the specification carefully. It is your reference for what will be delivered, so make sure every window and door on the list matches what you discussed.

Production and finishing in the factory

Once you approve the drawings, the frames are manufactured to measure in the workshop. Finishing is an important part of the process. Hot-dip galvanizing protects the steel core against corrosion, and powder coating gives the surface its colour and durability. Choosing the right finish is especially important for windows facing the coast or exposed to direct sun.

Installation without damaging the rest of the apartment

Installation involves removing the old frames, preparing the opening and fixing the new units so they are level, plumb and properly sealed. A good installer protects floors and furniture, and cleans up dust and debris before leaving. Ask how the gap between the frame and the wall will be sealed, since this affects both comfort and water resistance.

Practical tips for a smooth upgrade

Plan the replacement room by room if the full apartment cannot be done at once. Coordinate with other trades, such as painters and tilers, so that finishes are not damaged after installation. For buildings with a committee, check whether the facade appearance must follow shared guidelines before you choose the colour and profile.

Exact requirements for railings and safety elements follow the Israeli standard SI 1142, and specific values should always be checked with your engineer.

Frequently asked questions

Can steel-look windows fit into my existing wall openings?

In most cases yes, but the frames must be made to the actual measured size of your opening. An on-site measurement is the only reliable way to confirm the fit.

Do I need building committee approval?

It depends on your building's rules, especially if the change affects the facade's appearance. Check with the committee before ordering to avoid having to change the units later.

Will the new windows be noisy or drafty?

Properly installed profile windows with good seals reduce drafts and street noise noticeably. The glazing choice and the quality of installation both play a role.

How long does the whole process take?

The timeline depends on the number of openings, the approval stages and production scheduling. Your technician can outline the expected steps after the measurement visit.

Common mistakes to avoid

Ordering windows from photos without an on-site measurement, and skipping a careful review of the written specification. Both lead to costly corrections later.

Our recommendation

Measure every opening yourself as a cross-check against the technician's figures, and approve the drawings in writing before production starts. Ask specifically how the frame-to-wall gap will be sealed.

Summary

Replacing old windows with Belgian steel-look profiles combines a modern industrial look with better sealing and insulation for older apartments. Success depends on careful measurement, a clear written specification and proper installation.

Send us photos of your windows and we will arrange an on-sit

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ