top of page
‹ חזרה

Adding Glass Railings to an Existing Staircase: Process Guide

t348-34

t348-34

Adding a glass railing to an existing staircase is done by measuring the actual stair and its fixing points, producing custom glass panels and posts to that measurement, and installing them with base channels or fixings suited to the existing structure. The process runs from an initial inquiry with photos, through an on-site survey and written drawing, to factory production and installation. Confirming the structural and safety details with the engineer before production is what makes the result reliable.

Start with an inquiry and photos

The first step is a simple inquiry. Send photos of the staircase from the bottom and the top, along with any existing handrail, wall finish and floor edge. Note whether the stair is straight, curved or has landings, and whether the steps are tiled, wood or concrete. These details help us understand what is involved before anyone visits the site.

  • Photos of the full staircase
  • Current railing or wall condition
  • Type of stair material and finish

On-site measurement

A technician visits the home to measure the staircase precisely. Every step edge, the rise and run, the wall positions and the fixing surfaces are recorded. Existing railings may be removed or left in place depending on the design. Measurements are taken where the glass will actually sit, because stairs are rarely perfectly uniform, and small variations affect how the panels fit.

Drawing and written specification

Based on the measurements, we prepare a drawing showing the glass panel layout, post positions, fixing method and handrail profile if one is included. A written specification lists the materials, glass type and finishes so there are no surprises later. The drawing is sent to you for review, and nothing goes into production until you approve it in writing.

Client approval and engineering check

Glass railings carry safety loads, so the design should be checked against the relevant requirements. The Israeli railing standard SI 1142 covers the general principles, but exact values such as heights, loads and glass specifications are confirmed with the engineer for your specific staircase. Once the drawing, specification and engineering confirmation are approved, production can begin.

Production in the factory

Metal posts, base channels and handrails are cut, shaped and finished in our workshop, while the glass is ordered to the exact sizes from the approved drawing. Working in the factory allows precise fitting and consistent quality. Each component is checked against the drawing before it leaves the workshop, which reduces adjustments on site.

  • Cutting and forming metal parts to measure
  • Surface finishing such as hot-dip galvanizing or powder coating
  • Glass cut and prepared to the drawing

Installation and final check

On installation day, the base channels or fixings are set into the stair or wall first, then the posts and glass panels are fitted and secured. The team checks alignment, level and firmness before finishing up. Clean the glass and test the handrail at the end, and make sure the fixings are tight. A short walk-through explains how to care for the glass and finishes.

Frequently asked questions

Can glass be added to a stair that already has tiles or wood steps?

Yes, in most cases the glass can be fixed to the stair edge, the side wall or the floor using suitable base channels. The fixing method depends on the material and its strength, so it is confirmed during the site survey.

Do I need to remove my old railing first?

Not always. Sometimes the new glass system can be fixed beside or over the existing structure, while in other cases the old railing must be removed. This decision is made after measuring the stair.

How long does the process take from first contact to installation?

The timing depends on the complexity of the staircase, the approval steps and the production schedule, so we give you a timeline once the survey and drawing are complete.

Will I see a drawing before anything is made?

Yes. You receive a drawing and written specification to review and approve. Production only starts after your approval.

Common mistakes to avoid

Ordering glass based on rough measurements or photos alone often leads to panels that do not fit the actual stair. Skipping the engineering check on heights and fixings can also cause safety issues later.

Our recommendation

Measure and approve the full drawing before production, and confirm the fixing method for your specific stair material. Ask for the engineering check to be done before the glass is ordered.

Summary

Adding a glass railing to an existing staircase works best when it follows a clear process: inquiry, measurement, drawing, approval, factory production and careful installation.

Send us photos of your staircase and we will arrange a site

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ