Glass Display Case Installation: From Survey to Fitting
t433-30

Glass display case installation follows a set sequence: a site survey, a written specification with drawings, factory production of the frame and glass, finishing, and final fitting on site. Each step confirms measurements and details before the next one begins, which keeps the installation accurate and on schedule.
Step 1: Initial Inquiry and Site Survey
The process starts with an inquiry, ideally with photos of the space and a short description of how the vitrine or partition will be used. Based on this, we arrange an on-site measurement. During the survey we check wall condition, floor levelness, ceiling height, access routes for carrying glass, and any electrical or lighting points that the unit must work around.
- Exact wall and opening dimensions
- Floor and ceiling conditions
- Access for delivery and lifting
Step 2: Drawing and Written Specification
After the survey, we prepare a drawing and a written specification covering frame profile, glass type and thickness, edge finish, hardware, and the fixing method. The client reviews and approves these documents before any material is ordered. Clear approval at this stage prevents most changes later, which is especially important when several trades depend on the same dimensions.
Step 3: Production in the Factory
Once approved, the frame and glass are produced in our factory at 37 Rival Street, Tel Aviv. Cutting, welding or assembly, and glass preparation happen in a controlled environment rather than on a busy site. Producing in the workshop means the unit is built to the approved drawing and checked before it leaves for installation.
Step 4: Finishing and Quality Check
Metal parts receive the agreed finish, such as powder coating or galvanizing, depending on the environment and look required. Glass is inspected for edges, surface quality and fit. Before delivery, we confirm that the assembled unit matches the specification, so the site team receives components that are ready to install.
Step 5: Delivery and Preparation on Site
Before the installation team arrives, the site should be cleared, floors protected, and the fixing points accessible. Confirm that walls or floors are ready to receive anchors and that any finishing work near the unit is either complete or planned around. Good preparation shortens the fitting day and reduces the risk of damage to finished surfaces.
Step 6: Fitting and Final Inspection
The unit is positioned, levelled, plumbed and fixed according to the approved method. We then check alignment, gaps, door or panel movement, and the condition of the glass. A final walk-through with the project manager confirms that the installation matches the drawing, and any small adjustments are made before the team leaves the site.
Frequently asked questions
How long does a glass display case installation take?
Timing depends on the size, number of units and site conditions. Your project manager will confirm the schedule once the survey and specification are approved.
Do I need to be present during the site survey?
It helps if someone with decision-making authority is available, so questions about layout, access and finishes can be answered on the spot.
Can the glass be made to a custom size?
Yes. All glass and frames are made to measure based on the on-site survey and the approved drawing.
What should I prepare before the fitting day?
Clear the area, protect nearby floors and finishes, and make sure fixing points and access routes are ready so the team can work without delay.
Common mistakes to avoid
Approving a specification without checking measurements against the actual site is the most common error. Skipping site preparation before fitting day also causes delays and damage.
Our recommendation
Ask for the drawing and specification in writing and check dimensions against the survey before approving. Confirm that other trades have finished the surfaces around the unit, or agree on a sequence in advance.
Summary
Glass display case installation moves from survey to drawing, factory production, finishing, site preparation and fitting, with approval at each key stage.
Related guides
- On-Site Glass Partition Fitting and Sealing Services
- Measuring Your Space for a Custom Glass Partition
- Glass Partition Maintenance: Cleaning and Care Tips
- Glass Vitrine Dimensions and Depth Planning for Shops
- Removing Scratches from Display Case Glass
- Glass Partition Height and Width Planning Guide
- All models in this category
Send us photos and your site details, and we will arrange a
עוד מדריכים ודפים בנושא
- Glass Office Partition Installation: A Practical Guide
- How to Measure for a Custom Glass Partition: A Practical Guide
- Glass Vitrine Dimensions and Depth Planning for Shops
- Smoke Barriers and Glazed Fire Separation Walls: Design Notes
- Security Glazing Options for Retail Display Vitrines
- Tempered vs Laminated Glass for Vitrine Safety Explained
- Bronze-Tinted Glass Partitions for Warm Interiors
- Matte Black Glass Partition Designs for Modern Lofts
- Minimalist Glass Vitrines for Small Living Spaces
- Glass Vitrine Arrangement Tips for Balanced Living Rooms