top of page
‹ חזרה

On-Site Glass Partition Fitting and Sealing Services

t433-31

t433-31

On-site glass partition fitting means our crew measures, delivers and installs glass vitrines and partitions directly at the project, followed by proper sealing of every joint. Each partition is made to measure in our Tel Aviv factory, then fixed and finished so it sits level, stays stable and looks clean. Contractors can rely on one team from measurement to final sealing.

What On-Site Glass Partition Fitting Includes

On-site fitting covers everything needed to get a glass partition from the factory into its final position. Our crews bring the panels, profiles, fixings and sealing materials, then assemble and adjust each unit on the site. The goal is a partition that is plumb, aligned with neighboring elements and ready for use without further correction.

  • Delivery and safe handling of glass panels
  • Installation of floor and ceiling channels or frame profiles
  • Fixing of glass panels and hardware
  • Sealing of joints and final cleaning

Measuring Before Fabrication

Accurate fitting starts with accurate measurement. Before production, we visit the site to check wall and floor conditions, openings, ceiling heights and any irregularities. Walls are rarely perfectly straight, so the measurements taken on site decide how each panel is cut and how the frame is set out.

We record these details in a written specification that the contractor and architect can review and approve before any glass is cut. This step reduces rework and avoids surprises when the crew arrives.

Installation Process and Site Coordination

Our installation team works in a planned sequence so other trades can keep moving. We coordinate arrival times with the site manager, protect finished surfaces and confirm that the area is ready before the glass goes in. Large panels are moved with suitable equipment and by trained staff to protect people and material.

Typical sequence

  • Site check and protection of nearby work
  • Setting out the line and levels
  • Installing profiles and fixings
  • Placing and securing the glass panels

Sealing Joints for Durability and Appearance

Sealing is what turns installed glass into a finished partition. Joints between panels, frames and adjacent surfaces must be filled with the correct sealant so they stay watertight in wet areas and do not crack as the building moves. We apply the sealant with care, tool the joints for a neat line and remove any excess before it sets.

Choosing the right product depends on the location and exposure, so we confirm the sealing approach during the specification stage with the contractor and engineer.

Quality Checks and Handover

Before we leave the site, we check that each partition is level, plumb and firmly fixed. Panels are inspected for scratches, edges are cleaned and hardware is tested to confirm smooth operation of any doors or hinged elements. Any open points are noted and resolved with the site team.

A short handover walkthrough lets the contractor or client see the finished work and ask questions about care and cleaning of the glass.

Working With Contractors and Professional Crews

Contractors value a partner who arrives prepared and communicates clearly. Our crews are used to working alongside other trades on active sites, and we keep the project manager informed about progress, access needs and any change that affects the schedule. Written specifications, site photos and clear drawings help everyone agree on the scope before work begins.

Whether the project is a single office partition or a series of vitrines in a larger fit-out, we aim for a clean, predictable installation process.

Frequently asked questions

Do you measure the site before fabricating the glass?

Yes. We visit the site to take measurements and check the condition of walls, floors and ceilings before any glass is cut. This ensures the panels fit the actual space rather than drawings alone.

Can your crews work alongside other trades?

Yes. Our installers coordinate with the site manager and other trades, protect finished surfaces and agree on access times so the project keeps moving.

How are the joints between glass panels sealed?

We fill joints with the appropriate sealant, tool the lines for a neat finish and remove excess before it sets. The product is chosen based on the location and exposure of the partition.

What happens at the end of the installation?

We check that each partition is level, plumb and firmly fixed, test any hardware and clean the glass. A short handover lets the contractor review the finished work with us.

Common mistakes to avoid

Ordering glass from drawings without checking the site first often leads to panels that do not fit. Skipping proper sealing of joints can cause leaks and cracking later in the project.

Our recommendation

Confirm the final on-site dimensions, floor levels and sealing details before production starts, and share them with your crew in writing. Clear preparation saves time on installation day.

Summary

On-site glass partition fitting combines accurate measurement, careful installation and proper joint sealing, handled by our Tel Aviv team for contractors who need reliable results.

Send us your plans and site photos, and we will arrange a me

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ