top of page
‹ חזרה

How to Order Custom Stair Railing Sections Online in Israel

t334-41

t334-41

To order custom stair railing sections online, send clear photos and approximate dimensions of your staircase, then arrange an on-site measurement so the factory can produce exact sections. You receive a drawing and written specification for approval before production starts, and the sections are finished and installed on site.

Start with photos and basic details

The first step is an inquiry with photos of the staircase, the wall or opening it attaches to, and any existing railing you want to replace. Photos from a few angles help the factory understand the layout, the landing, and the height of the steps.

It also helps to note what the railing is for, such as a private home, a building committee, or a contractor's project. Mention the material you prefer, whether iron, stainless steel, or glass infill, and any design style you have in mind. This information lets the team give you a sensible starting point before anyone visits.

On-site measurement

Accurate measurement is what makes custom sections fit. A technician visits the site and measures the rise and run of the stairs, the height of the handrail from the nosing, the wall-to-wall distances, and the anchor points in the wall, floor or steps.

  • Length of each straight run and landing
  • Angle of the stair and any curved sections
  • Type of base: concrete, tile, or steel
  • Obstacles such as window frames or pipes

Measurements taken on site are used directly for the drawings, so this step matters more than any other.

Drawings and written specification

After measuring, the factory prepares a drawing showing each section, its dimensions, the post positions, and the fixing method. A written specification accompanies it, listing the materials, profiles, infill, and finish.

Read both documents carefully. Check that the heights, lengths, and locations match what you expect from the site visit. If something looks wrong, ask before approving. Changes are much easier at this stage than after production has begun.

Client approval before production

Production starts only after you approve the drawing and specification in writing. This protects both sides: you know exactly what will be made, and the factory builds to a confirmed plan.

If you are working through an architect, interior designer, or contractor, have them review the drawing as well. Approval from the right people at this point avoids disputes later.

Production and finishing

Sections are cut, welded and assembled in the factory to the approved drawing. Each piece is checked against the measurements before it moves on. Finishing depends on the material and the environment, and options commonly include hot-dip galvanizing and powder coating for iron, which protect against corrosion and give a durable colored surface.

Ask the team how the chosen finish suits your location, especially if the railing is outdoors or near the sea, where corrosion protection matters most.

Installation and final checks

Installation follows production. Sections are fixed to the steps or wall using the anchors specified in the drawing, and posts and handrails are aligned so the railing runs smoothly along the stair.

After installation, check that the handrail height is comfortable, the gaps and infill meet safety expectations, and the fixings feel solid. For exact safety values, such as those covered by the Israeli railing standard SI 1142, confirm the details with the engineer on the project.

Frequently asked questions

Can I order stair railing sections without a site visit?

Photos and rough dimensions can start the inquiry, but an on-site measurement is recommended before production. Measured dimensions are what make the sections fit the staircase correctly.

What do I receive before production starts?

You receive a drawing with dimensions and a written specification of materials and finish. Production begins only after you approve both in writing.

Can I change the design after approving the drawing?

Changes are possible before production begins, but they are simplest to make at the drawing stage. Ask the factory how a change would affect the plan before approving.

Who installs the railing?

Installation is part of the process after the sections are finished in the factory. Confirm the installation details and any site preparation with the team when you place the order.

Common mistakes to avoid

The most common error is ordering from rough measurements without an on-site check, which leads to sections that do not align. Approving a drawing without reading the heights and fixing points is the other frequent mistake.

Our recommendation

Mark the exact handrail height and the intended wall or base positions on the staircase before the measurement visit, and have the drawing checked against the site by a second person before approving it.

Summary

Ordering custom stair railing sections works best with clear photos, an accurate on-site measurement, and a written drawing approved before production. Following that sequence gives you railings that fit and last.

Send us photos of your staircase and we will arrange a measu

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ