top of page
‹ חזרה

How to Order Replacement Stainless Steel Brackets

t464-41

t464-41

To order replacement stainless steel brackets, send clear photos of the damaged part and its surroundings, then arrange an on-site measurement so the new brackets are made to the exact dimensions. The factory prepares a drawing and written specification for your approval before production starts, which helps the replacement fit the existing structure the first time.

Start with clear photos of the damaged bracket

The first step is an inquiry with photos. Take a picture of the broken or corroded bracket from a few angles, and include a wider shot showing where it is mounted, such as the wall, post, railing or frame. Photos of the fixing points are especially useful, because they show how the bracket attaches.

If you still have the original part, include it in one of the photos next to a tape measure. This gives the workshop a quick sense of scale before anyone visits the site.

Measure on site to get an exact fit

After the inquiry, a technician measures on site. Measuring the bracket yourself is possible, but matching the holes, spacing and profile of the existing structure is easier with a professional check, especially where the old part was installed years ago and the wall or frame may have shifted.

  • Distance between fixing holes
  • Hole diameter and position
  • Profile thickness and projection from the wall
  • Condition of the surrounding material

Review the drawing and written specification

Once the measurements are taken, the factory prepares a drawing and a written specification. Read both carefully. They describe the material, dimensions, finish and fixing method, and they are the basis for production. If anything differs from what you expect, such as the grade of stainless steel or the type of fastening, raise it before approving.

Approval in writing protects both sides. It confirms that the replacement matches what is needed on site.

Production and finishing in the factory

After you approve the specification, the brackets are made in the factory to your measurements. Stainless steel is cut, shaped and assembled according to the drawing, and the finish is applied as agreed. Working from an approved specification keeps the new part consistent with the rest of the installation, which matters when only one or two brackets are being replaced.

Installation and matching the existing system

When the brackets are ready, they are installed on site. Installation is the final check: the new part should line up with the existing fixings and load points without forcing. If an existing anchor or wall plug is damaged, address it at the same visit so the new bracket is secured properly.

Keep the old bracket until the replacement is fitted, as it can help confirm the design if questions come up later.

Plan for safety-critical railings and structures

Brackets that support railings, handrails or balconies carry real loads, so their condition matters. The Israeli railing standard SI 1142 sets the general requirements for railings, but exact values for a given installation should be checked with the engineer responsible for the project rather than assumed from memory.

If a bracket has bent, cracked or pulled out of its anchor point, treat it as urgent and do not rely on a temporary fix.

Frequently asked questions

Do I need to take the old bracket to the factory?

It is not always necessary. Clear photos and accurate measurements are often enough, though keeping the old part can help if the design is unusual.

Can you match an existing bracket from a photo alone?

A photo helps identify the type, but a measurement on site is what ensures the hole spacing and profile fit correctly.

Why is written approval required before production?

The written specification records the material, dimensions and finish, so both sides agree on exactly what will be made before work begins.

Who installs the replacement brackets?

Installation is part of the process after the parts are ready. Confirm the arrangement for your site when you make the inquiry.

Common mistakes to avoid

Ordering from memory without measuring the holes and projection often leads to a bracket that does not fit. Skipping the written specification review can also result in the wrong grade or finish being produced.

Our recommendation

Send photos that include the fixing points and a tape measure reference, and approve the written drawing before production starts. For railings and load-bearing parts, confirm details with the responsible engineer.

Summary

Send clear photos, arrange an on-site measurement, approve the written specification, and then the brackets are produced and installed to fit your existing structure.

Send us photos of the damaged bracket and we will arrange a

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ