
How to Relocate an Aluminum Fence: Process from Measurement to Installation
t306-39

An aluminum fence can usually be relocated if its panels, posts and fixings are in sound condition and the new layout suits the ground and the property line. The safest approach is a site measurement, a written drawing of the new position, and then careful dismantling, reuse of sound parts and reinstallation with new fixings where needed.
Check whether your fence is suitable for moving
Not every fence is worth relocating. Before anything is taken apart, we look at the panels, posts, welds and fixings to see whether they can be reused safely. Aluminum is light and generally holds up well to removal, but bent sections, cracked welds or corroded anchors may need replacing.
- Condition of panels and infill bars
- State of posts and their base connections
- Type of fixing used in the existing ground or wall
- Whether the original sections are still available to match
If the fence was built a long time ago, we also check that the new layout still meets the requirements that apply to railings and barriers, with exact values confirmed by the engineer.
Measure the existing and new positions on site
Accurate measurement is the foundation of a good relocation. We record the length and height of every run, the spacing of posts, the position of gates and any corners or level changes. For the new position we mark the proposed line on the ground and check the slope, the surface type and the distance to edges, drains and utility lines.
Photos from several angles help us plan the work, and they make the discussion with you, the building committee or the contractor much clearer before we start.
Prepare a drawing and written specification
Once the measurements are complete, we prepare a drawing that shows the new route, post positions, gate locations and fixing points. A short written specification accompanies it, listing the sections to be reused, the sections to be produced new, the finish and the installation method.
You review and approve the drawing before production begins. This step prevents misunderstandings about length, height or gate swing, and it gives architects and contractors a clear document to work from.
Dismantle carefully and reuse sound parts
Dismantling is done with the fence unloaded and in sections, so that panels and posts can be lowered without bending. Each piece is numbered so that it returns to the same place or can be matched during reinstallation.
Parts that show damage are set aside. We cut or add new sections at our factory at 37 Rival Street, Tel Aviv, so that the relocated fence matches the original look, and missing pieces are produced to measure rather than improvised on site.
Produce new parts and finish them in the factory
Where new sections are needed, they are made in our workshop from iron or aluminum to the approved drawing. Finishing is applied before installation, with hot-dip galvanizing or powder coating for iron and suitable surface treatment for aluminum, so the new and reused parts look consistent once they are fixed in place.
Doing this work in the factory means cutting, welding and coating are carried out under controlled conditions rather than in the open yard.
Reinstall, level and check the finished fence
Installation starts with setting the posts at the marked points, checking that they are plumb and at the correct height, and fixing them with suitable anchors for the surface. Panels are then fitted between posts, gates are hung and adjusted so they open and close freely.
- Check alignment with a level along the full run
- Test gate swing and latch operation
- Confirm all fixings are tight and finishes are undamaged
We walk the completed fence with you before we consider the job done, so any small adjustment can be made on the spot.
Frequently asked questions
Can every aluminum fence be relocated?
Most can, provided the panels and posts are sound and the new position suits the ground. Badly damaged sections are usually replaced with new ones made to match.
Do I need a drawing before the fence is moved?
Yes, a drawing and written specification are recommended so that the new layout, gate positions and fixings are agreed before any work begins.
Will the relocated fence look the same as before?
In most cases yes, because we reuse the original sections and produce any missing parts to match, using the same finish where possible.
Who should I involve if the fence is on a shared property line?
Involve your building committee, neighbors or the relevant contractor early, and confirm the exact line before measuring so the new position is approved.
Common mistakes to avoid
Starting to dismantle before measuring and approving a drawing often leads to lost parts and mismatched lengths. Moving posts without checking the new ground and fixing method can also cause the fence to loosen over time.
Our recommendation
Measure the new line twice, mark it on the ground, and approve a written drawing before any panel is removed. Keep the original sections numbered so reinstallation goes quickly and accurately.
Summary
Relocating an aluminum fence works best with a clear measurement, an approved drawing, careful dismantling and factory production of any missing parts. Following this process keeps the fence secure and visually consistent.
Related guides
Send us photos and the approximate measurements of your fenc
עוד מדריכים ודפים בנושא
- Seasonal Fence Inspection Checklist for Iron and Aluminum Fences
- Removing Rust Spots From Iron Fence Bars: A Practical Guide
- Cleaning and Maintenance Steps for Metal Fences
- Replacing a Single Fence Panel Without Full Removal
- Iron Fence Welding Repair: When to Weld and When to Replace
- Aluminum Fence Joint Sealing: Caulking Guide for Installers
- Fence Post Base Protection: Keeping Iron and Aluminum Fences Dry
- Fence Anchoring Methods for Sandy and Rocky Soil
- Electrical Wiring Planning for Fence Automation
- Choosing the Right Fence Height for Privacy and Security
