top of page
‹ חזרה

Multi Lane Parking Barrier Layout: Planning Car Park Entrances

t460-7

t460-7

A multi lane parking barrier layout is planned by first counting the entry and exit lanes, then checking queuing space, vehicle types and traffic flow before fixing barrier positions. Techno Kol Uzi designs each layout to measure, based on an on-site survey, a drawing and a written specification approved by the architect before production begins.

Start with the traffic plan, not the barrier

Before choosing any barrier, establish how many vehicles must enter and leave at peak times. Ask the facility operator about expected arrivals, the share of residents or visitors, and whether delivery vehicles or larger vehicles will use the same lanes.

  • Peak entry and exit volumes per hour
  • Mix of cars, vans and trucks
  • Separate or shared lanes for pedestrians

These answers decide how many lanes are needed and how wide each one must be.

Measure the site and the approach

On-site measurement is the foundation of a reliable layout. Record the width of the driveway, the distance from the street line to the barrier position, the slope of the approach and the location of columns, drains and utility boxes. Note the space available for a vehicle to wait without blocking the public road.

Take photos of the surroundings and mark the exact centre line of each planned lane. Accurate site data prevents redrawing later.

Plan queuing space and barrier positions

Queuing space is often underestimated. Each waiting vehicle needs room for its length plus a safe gap, and the first vehicle must be able to reach the reader or intercom without reversing. Place barriers far enough from the street so that a queue does not spill onto the sidewalk.

Keep lanes parallel where possible and leave clear space between barrier housings for maintenance access. Confirm the required clearance with the project engineer, as exact values depend on the specific product and building standards.

Prepare the drawing and specification

Once measurements are complete, we prepare a scaled plan showing each lane, barrier position, foundation, cable routes and gate or pedestrian interfaces. A written specification accompanies the drawing and lists the barrier type, finish, arm details and mounting method.

The architect reviews and approves the drawing and specification in writing. Changes made at this stage cost far less than changes made after production.

Production in our Tel Aviv workshop

After approval, the barriers and related steel components are manufactured at our factory on Rival Street in Tel Aviv. Components are cut, welded and assembled to the approved dimensions, then finished with hot-dip galvanizing or powder coating suited to outdoor car park conditions.

Producing in-house allows us to check fit and dimensions before anything reaches the site, which reduces surprises during installation.

Installation and commissioning

Installation begins with foundations set to the approved drawing, followed by barrier units, arms and control connections. Our team checks alignment, arm travel and safety features before handover. Coordinate with the electrical contractor early so that cable ducts and power points are ready when the barriers arrive.

A final walkthrough with the facility operator confirms that each lane functions correctly under normal traffic.

Frequently asked questions

How many lanes does a car park entrance usually need?

The number depends on peak hourly traffic, vehicle mix and how quickly each lane can process vehicles. A traffic plan based on expected volumes is the best basis for the decision.

What information should an architect provide before a site visit?

Share the site plan, the approved driveway layout and any known constraints such as columns or utilities. Note the expected traffic volumes and vehicle types so the measurement visit is focused.

Can the layout be changed after production starts?

Changes after production are costly, so the drawing and specification should be approved in writing first. Minor site adjustments can sometimes be handled during installation, but major changes should be avoided.

Do you handle both the barriers and the surrounding steelwork?

Yes, we manufacture parking barriers together with related steel structures and gates. Coordinating everything through one workshop helps keep dimensions and finishes consistent.

Common mistakes to avoid

The most common error is planning lanes without measuring real queuing space, which causes vehicles to block the street. Skipping the written approval of the drawing also leads to costly changes after production.

Our recommendation

Model the peak-hour queue on the drawing before fixing barrier positions, and leave extra space for larger vehicles. Confirm exact clearances with the project engineer rather than relying on rough estimates.

Summary

A good multi lane layout starts with traffic data, accurate site measurement and an approved drawing. Following these steps leads to smoother entry, fewer changes and reliable installation.

Send us your site photos and a rough lane plan, and we will

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ