top of page
‹ חזרה

How Traffic Volume Determines Parking Barrier Speed and Size

t460-6

t460-6

Parking barrier speed and boom size are chosen by how many vehicles pass per hour at peak times and how long each one waits at the lane. Higher volumes need faster operators, sturdier booms and sometimes dual lanes, while low-volume sites can use simpler, slower units.

Why traffic volume matters for barrier selection

A parking barrier is a moving part that gets used hundreds or thousands of times a day. If it is too slow for the flow of cars, queues form at the entrance and drivers become frustrated. If it is too heavy or undersized for its boom length, it wears out quickly and needs repairs.

Traffic volume is therefore the starting point of any barrier decision. Operators usually think first about the number of vehicles per hour, then about how long each car spends at the lane, and only then about the hardware details.

Measuring traffic at your car park

The most useful data comes from counting vehicles over several typical days, including the busiest hours. Note the entries and exits separately, because they often peak at different times, such as morning arrivals or evening departures.

  • Count vehicles per hour at peak and off-peak times
  • Record average waiting time at the lane
  • Note the share of cards, tickets and intercom requests
  • Check whether trucks or long vehicles use the lane

These figures guide the speed rating and the boom length, and they help identify whether one lane is enough.

How speed and boom size relate to flow

Opening and closing speed affects how many cars can pass per minute. A fast operator suits high-volume entrances where each car should clear the lane quickly. For lower volumes, a standard speed is usually sufficient and keeps the system quieter and less demanding on components.

Boom length matters too. A longer boom covers wider lanes and suits certain layouts, but it moves more mass, which needs a stronger drive. Our team checks the boom length against the lane width and the expected use before recommending a size. Exact safety and mechanical values are confirmed with the engineer on site.

From drawing to production in our Tel Aviv factory

Once the site survey is complete, we prepare a drawing and a written specification that list the barrier model, boom type, speed setting and any framing or base work. The client approves the document before production begins.

Our factory at 37 Rival Street in Tel Aviv then builds the steel frames and booms to measure. Exposed steel receives hot-dip galvanizing and powder coating so that the unit holds up to outdoor weather and frequent use.

Installation and commissioning

On installation day, the base is set level, the barrier is anchored, and the boom is aligned so it stops at the correct height and does not hit the ground or the vehicle. The control connections for cards, tickets or intercoms are tested under real traffic conditions.

Before handover, we check that the speed setting matches the volume figures from the survey. If the site changes later, for example when a second entrance opens, the settings can be reviewed and adjusted.

Planning for future growth

Car parks rarely stay the same. New residents, tenants or customers can increase volume within a few years. When planning, consider a small margin above current peak counts so the barrier does not reach its limit on day one.

In some cases a second lane, or a barrier that can be upgraded to faster operation, is a more practical choice than replacing the whole installation later. Discuss expected growth at the first meeting so the drawing reflects it.

Frequently asked questions

How do I know if my car park needs a faster barrier?

If vehicles regularly queue at the entrance during peak hours, or drivers wait noticeably at the lane, a faster operator is worth considering. A traffic count over several busy days gives a clear answer.

Does a longer boom always mean a slower barrier?

Not always, but a longer boom carries more weight, so it needs a stronger drive and is often set to a more moderate speed. The right balance depends on lane width and expected use.

Can one barrier handle both entry and exit traffic?

It can for low to moderate volumes, but when entry and exit peaks overlap, separate lanes usually work better. A site survey shows which option suits your flow.

Do you measure the site before quoting a barrier?

Yes. Our process starts with an inquiry and photos, followed by on-site measurement, a drawing and written specification, and client approval before production begins.

Common mistakes to avoid

Choosing a barrier based only on the lane width, without counting real traffic, often leads to queues or early wear. Ignoring peak hours and future growth causes the same problems within a short time.

Our recommendation

Count vehicles during your busiest hours for at least a few typical days, then choose a speed and boom size with a small margin above that peak. Share the counts with your installer so the specification matches how the car park is really used.

Summary

Traffic volume sets how fast a parking barrier must operate and how large its boom should be, so measure real peak flow before choosing hardware. Planning for growth from the start avoids costly upgrades later.

Send us photos and your approximate peak traffic, and we wil

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ