top of page
‹ חזרה

Request Custom Staircase Fabrication for Your Project

t390-47

t390-47

To request custom staircase fabrication, send photos and basic dimensions of the stair opening, then arrange an on-site measurement and receive a written drawing for approval before production begins. Techno Kol Uzi manufactures steel staircases to measure in its Tel Aviv factory, then finishes and installs them on site.

Start With a Clear Inquiry

A good request begins with information that lets us understand the project quickly. Send photos of the existing opening or structure, the approximate floor-to-floor height, the available width and length, and the number of steps you need. If the staircase connects to an existing slab, mention whether it will be fixed to concrete, steel beams or a wall.

  • Photos from several angles
  • Floor-to-floor height and available footprint
  • Preferred style and finish
  • Project timeline and site access

Clear early information reduces revisions later and helps us plan the next steps correctly.

On-Site Measurement

Accurate measurement is the foundation of a custom steel staircase. Our team visits the site to check the opening, the level of each floor, wall alignment and any obstacles such as beams, ducts or columns. Measurements are taken at the actual site conditions, not only from plans, because construction tolerances often differ from drawings.

Please make sure the structure is in its final condition where possible, or let us know which elements may still change, so that the measurement reflects the staircase's real fit.

Drawing, Specification and Approval

After measuring, we prepare a drawing and a written specification covering the stringers, treads, landings, handrail and guardrail details, connections and finish. The document describes what will be built so that the contractor, architect or engineer can review it before work starts. Railing requirements follow the Israeli railing standard SI 1142, and exact structural and safety values are verified with the project engineer.

Nothing goes into production until the client approves the drawing in writing. Any changes are recorded and reissued before fabrication.

Production in the Factory

Once approved, the staircase is cut, welded and assembled in our factory on Rival Street in Tel Aviv. Working in the workshop allows precise control over alignment, step spacing and weld quality, which is difficult to achieve fully on site. Components are checked during assembly so that the final pieces match the measured dimensions.

Fabrication is carried out by experienced metalworkers who have been producing steel structures for decades, giving projects consistent quality from the first piece to the last.

Finishing: Galvanizing or Powder Coating

Finishing protects the steel and defines the final appearance. Hot-dip galvanizing provides strong corrosion protection, which suits exposed areas and buildings near the coast. Powder coating offers a wide choice of colors and textures and can be applied after galvanizing for added durability and style.

The right finish depends on the environment, the look required by the architect and the maintenance expectations of the building. We can advise which option fits your project best.

Delivery and Installation

Finished components are transported to the site and installed according to the approved drawing. Our team confirms levels, fixing points and alignment during installation and checks that the handrail and guardrail are secure and in the correct position. Where needed, we coordinate fixing details with the contractor and the structural engineer before anchoring.

  • Delivery planned with site access in mind
  • Installation checked against the drawing
  • Coordination with other trades

Frequently asked questions

How long does it take to get a custom staircase quote?

The first step is to send your photos and dimensions, after which we arrange a site visit to measure. Timing depends on the project schedule, so please share your deadlines when you make the request.

Do you produce staircases from my architect's drawings?

Yes, we can work from architectural or structural drawings, but we always verify the measurements on site. We then issue our own detailed drawing for approval before production.

Can the staircase be installed on an existing concrete slab?

In many cases yes, provided the fixing points are suitable. We check the existing structure during the site visit and advise on the fixing method that suits it.

Which finish should I choose for an exterior staircase?

Hot-dip galvanizing combined with powder coating is a common choice for exterior staircases because it protects the steel well. We can recommend the best finish based on your location and design.

Common mistakes to avoid

A common mistake is ordering a staircase from plans alone without verifying the real opening on site, which often leads to fit problems. Another is approving a drawing without checking the step count, headroom and handrail details.

Our recommendation

Measure and confirm the final opening after the surrounding structure is complete, and approve the written drawing before production starts. This simple sequence prevents most fit and redesign issues.

Summary

Send photos and dimensions, confirm the site measurement, approve the drawing, and then let the staircase be fabricated and installed to a verified fit.

Send us your photos and dimensions today to request your cus

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ