top of page
‹ חזרה

Planning Glass Partitions for Open-Plan Offices

t432-5

t432-5

Glass office partitions work best when you plan the layout, sightlines, sound needs and door positions before measuring. A good plan starts with the team's workflow, followed by an on-site measurement, a written drawing and approval before production begins.

Start with how the office actually works

Before choosing any glass, decide what each zone needs to do. A meeting room needs sound control and privacy, while a desk area for focused work may only need a visual break. Walk through a normal day with the team and note where people talk, where they concentrate and where traffic flows.

Write down the number of rooms you want, their approximate size and whether any of them must be closed off completely. This list becomes the basis for every decision that follows.

Measure on site before drawing

Measurement is the step that prevents most problems later. Our team visits the office, checks the floor for level, the ceiling height, the position of columns and any existing ducts or cable trays. Measurements are taken at several points because floors and walls are rarely perfectly straight.

  • Ceiling height at each partition line
  • Floor levelness and any gaps at the base
  • Positions of doors, windows and columns
  • Electrical and data outlets that may affect framing

Choose glass, framing and door layout

Glass partitions can be single or double glazed, clear or frosted, and framed in steel or aluminum. Frosted or patterned glass gives privacy without fully blocking light, which helps smaller offices feel open. Door position matters too: a door placed where people naturally walk keeps traffic off the desks.

Discuss the finish you want for the frames so they match the rest of the office. Ask us to show how the frame profiles will look in the planned layout.

Drawing, specification and approval

Once measurements are complete, we prepare a drawing and a written specification covering dimensions, glass type, frame profile, door hardware and finish. You review the drawing with your team and confirm every panel and opening before anything goes into production. Changes at this stage are simple and inexpensive, while changes after production are not.

Keep a single person responsible for sign-off so instructions do not conflict.

Production in our factory

After approval, the frames and fittings are cut and assembled in our workshop at Rival Street 37 in Tel Aviv. Working in the factory lets us control the accuracy of each piece and prepare the metalwork for finishing. Glass is sized and prepared to the approved drawing, so site work is kept to a minimum.

Metal parts receive their surface treatment, such as hot-dip galvanizing or powder coating, before they leave the workshop.

Installation and final checks

On installation day, the frames are fixed to the floor and ceiling, the glass panels are set, and doors are hung and adjusted. We check that every panel is plumb, every door closes properly and the seals are tight. Any small adjustments are made before we leave.

Plan installation for a time when the area can be cleared, and let us know in advance about any access or working-hour restrictions in your building.

Frequently asked questions

How early should we plan glass partitions in a renovation?

Plan them as soon as the layout is being decided, ideally before electrical and ceiling work is finalized. Early planning lets the partition positions guide cable routes and lighting.

Can glass partitions give enough sound privacy for meeting rooms?

Yes, especially with laminated or double-glazed glass and well-sealed frames and doors. The exact level of sound control depends on the design, and we confirm the details with you during planning.

Do we need to remove existing partitions before installation?

This depends on the site. We assess during the on-site visit and let you know whether removal or preparation work is needed before installation.

Can the glass partitions be changed later if the team grows?

Modular framing makes future changes easier. Discuss expansion plans during the planning stage so the layout can allow for them.

Common mistakes to avoid

A common mistake is ordering glass before the layout is final or measuring only once in a single spot. Skipping the written drawing and approval step often leads to panels or doors in the wrong place.

Our recommendation

Mark the planned partition lines on the floor with tape and walk through them with your team for a day before approving the drawing. This quick test reveals sightline, door swing and circulation issues that drawings can miss.

Summary

Good glass office partitions come from understanding how the team works, careful on-site measurement, a clear approved drawing and controlled production and installation.

Send us photos and your floor plan, and we will arrange an o

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ