Schedule Stainless Railing Installation for Your Property

t474-41

t474-41

To schedule stainless railing installation, start with an inquiry including photos of the space, then book an on-site measurement so the railing is made to your exact dimensions. After you approve the drawing and written specification, the stainless steel works are produced in our Tel Aviv factory and installed on a date agreed in advance.

Step 1: Send an Inquiry with Photos

The first step is to contact us and describe the railing you need. Photos help us understand the site quickly: the balcony, staircase or terrace, the wall or floor it attaches to, and any existing railing you want to replace.

Include a rough idea of the length and the number of sections if you know them, along with your preferred style, such as plain, horizontal bars, vertical bars or a glass infill. Clear information at this stage shortens the planning process and helps us propose the right solution.

Step 2: On-Site Measurement

After reviewing your inquiry, we arrange a visit to measure the area. Accurate measurement is the foundation of a good railing, because even a small error in height or spacing will be visible once installed.

  • Length of each run and corners
  • Height from the finished floor or step edge
  • Wall, floor or slab construction and fixing points
  • Gaps, uneven surfaces and obstacles

Please keep the area accessible on the appointment day.

Step 3: Drawing and Written Specification

Based on the measurements, we prepare a drawing that shows the layout, dimensions, fixing method and infill pattern. A written specification accompanies it, listing the materials, the stainless steel grade, the finish and the installation details.

Review both documents carefully. Ask questions about anything unclear. Where safety requirements apply, such as heights and gap sizes under the Israeli railing standard SI 1142, our engineer will confirm that the exact values fit your project before production begins.

Step 4: Client Approval

Production starts only after you approve the drawing and specification in writing. This step protects both sides: any change requested after production is far more costly and slower to resolve than one made on paper.

Once approved, we confirm the production schedule and the planned installation date. If your property has a building committee or a contractor, make sure the approving party is included at this stage.

Step 5: Factory Production and Finishing

Your railing is manufactured in our factory at 37 Rival Street, Tel Aviv, which has operated since 1945 and is run by the third generation of the family. Stainless steel components are cut, shaped, welded and assembled to the approved drawing.

Finishing is then completed as specified, so the railing is ready to install without rework on site. Parts are checked against the drawing before they leave the workshop.

Step 6: Installation Day

On the agreed date, our installation team arrives with the finished railing and fixings. Before fixing, they check the layout against the drawing and the site conditions, then mount the sections securely and level them.

  • Confirm the area is clear and accessible
  • Have the approved drawing available
  • Plan for a final walkthrough with the installer

Once installation is complete, we review the work together with you.

Frequently asked questions

How far in advance should I book the installation?

Book as early as possible once your drawing is approved, because production time comes before the fitting day. Contact us to get a current schedule for your project.

Do I need to be home during the measurement?

Someone with authority to make decisions about the site should be present. This ensures questions about fixing points, heights and layout can be answered on the spot.

Can I change the design after approving the drawing?

Changes are possible before production starts, but they may affect the schedule. Requests after production begins are harder to accommodate, so review the drawing carefully before signing off.

Is a stainless railing suitable for outdoor balconies?

Stainless steel is well suited to outdoor use because it resists corrosion. Tell us about the exposure of your site so we can recommend the appropriate grade and finish.

Common mistakes to avoid

The most common mistake is approving a drawing without checking the dimensions and fixing points against the actual site. Skipping the measurement or rushing approval often leads to costly corrections after production.

Our recommendation

Measure your site yourself before the visit, noting heights and lengths, so you can compare them with our measurements. Keep the approved drawing and specification on file for the installer and any building committee.

Summary

Scheduling stainless railing installation follows a clear path: inquiry, measurement, drawing, approval, factory production and installation day. Planning each step in order keeps the result accurate and the timeline predictable.

Send us photos of your space and request your on-site measur