top of page
‹ חזרה

Approving Glass Railing Drawings Before Production Starts

t348-41

t348-41

To approve glass railing drawings, check the measured dimensions, the glass specification, the fixing method and the finish against your site before signing. Once you approve in writing, the drawing becomes the basis for fabrication, so any change after that point is harder and slower to make.

Why the drawing is the most important step

The drawing turns your balcony or stair into a set of exact measurements, materials and fixing points. Everything the factory cuts, bends and assembles follows this document. A careful review at this stage prevents most of the problems that show up on installation day, such as a panel that does not fit or a post that lands in the wrong place.

Treat the drawing as a contract for the details, not just a picture. If something on it does not match what you expected, raise it before you sign, while changes are still simple.

What to check on the drawing

Go through the drawing with a checklist so nothing is missed:

  • Overall length and height of each railing run, matching your on-site measurement
  • Position and spacing of the base posts or floor channels
  • Glass panel sizes, thickness and type (laminated or tempered)
  • Handrail profile, height and whether it is on top or side-mounted
  • Fixing method to the slab, wall or steps
  • Finish color and coating

Each line should match what you agreed during the on-site visit.

Confirm measurements and site conditions

Drawings are only as accurate as the measurements behind them. Our team measures on site, but walls can be out of plumb and slabs are rarely perfectly level. Point out any uneven areas, existing tiles, or future finishes such as thicker flooring that could change the final height.

If you plan to add tiles or screed after installation, tell us before the drawing is finalized so the base fixings can be planned around the final level.

Glass type, fixings and safety

Glass railings must meet the Israeli railing standard SI 1142 for strength and height. The exact values depend on your building and are checked with the engineer during design, so we will not guess them for you. What you should confirm is the glass type shown on the drawing, the fixing system and whether the design suits the way the space will be used, for example with children or pets nearby.

Ask questions about any fixing you do not understand. A clear explanation now is better than a surprise later.

Signing off and moving into production

When the drawing is correct, we ask for written approval, usually by signing the drawing or confirming in writing. This sign-off starts production in our Tel Aviv workshop at Rival Street 37. Glass, steel or aluminum parts are cut, finished and prepared to your specification.

Keep a copy of the approved drawing with your records. It is the reference if questions come up later.

What happens after approval

After approval, the work moves through production, finishing such as hot-dip galvanizing or powder coating where applicable, and then installation. You will be kept informed at each stage. If you want a change once production has started, tell us as early as possible, because parts already cut may need to be remade.

Clear approval at the drawing stage keeps the project on track and the installation day simple.

Frequently asked questions

Can I change the drawing after I approve it?

Small changes may be possible, but once production has started, changes can require remaking parts. Raise any concerns before you sign to avoid delays.

Who checks the measurements on the drawing?

Our team measures on site and prepares the drawing from those measurements. Please review the drawing against your own understanding of the space before approving.

Do I need to approve in writing?

Yes, we ask for written approval, such as a signed drawing or written confirmation, before production begins. This protects both you and the factory.

What if my floor will be tiled after installation?

Tell us before the drawing is finalized, since added tile or screed changes the final height. We can then plan the base fixings around the finished level.

Common mistakes to avoid

Approving the drawing quickly without checking the height, glass type and fixing points against the site. Mistakes found after production are the most costly to fix.

Our recommendation

Check the drawing next to the actual balcony or stair, and note any planned floor finishes before signing. A five-minute review of the measurements and fixings usually saves days of rework.

Summary

Review every measurement, glass specification and fixing on the drawing, then approve it in writing before production starts. Clear approval at this stage keeps your glass railing project accurate and on schedule.

Send us your photos and questions, and we will help you revi

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ