top of page
‹ חזרה

Custom Steel Staircase Production Timeline Explained

t390-23

t390-23

A custom steel staircase typically moves through inquiry, on-site measurement, drawing approval, factory production, finishing and installation. The production stage depends on the design complexity and the finish chosen, while the approval steps depend largely on how quickly the client responds.

Stage 1: Inquiry and Initial Information

Every project starts with an inquiry. Sending clear photos of the staircase space, the floor plan, and a rough idea of the style you want helps us understand the scope right away. Tell us whether the staircase is interior or exterior, straight or turning, and whether it connects to a railing or glass balustrade you already have in mind.

  • Photos of the space from several angles
  • Approximate floor-to-floor height
  • Preferred style and finish

Good information at this stage often saves time later in the process.

Stage 2: On-Site Measurement

Accurate measurement is the foundation of a custom steel staircase. Our team visits the site to record the exact rise, run, opening dimensions and wall conditions. Measurements are taken on finished floors where possible, because even a small difference in floor finish can change the step height. This visit is usually scheduled within a short period after the inquiry, depending on our workload and access to the building.

If the building is still under construction, we will discuss with the contractor when the structure will be ready for measurement.

Stage 3: Drawing and Written Specification

After measuring, we prepare a drawing and a written specification. The drawing shows the stringers, treads, landings, connections and fixing points. The specification lists the materials, profiles, finish and any glass or railing elements. Review this document carefully, because changes made after production has started are the most common cause of delays.

What to check before approving

  • Step dimensions and total height
  • Railing position and handrail details
  • Finish type and colour

Stage 4: Client Approval and Scheduling

Once the drawing and specification are approved in writing, the project is scheduled into production. Approval is the point where the timeline becomes firm. Responding promptly to questions from our team keeps the project on track. If you are coordinating with an architect, interior designer or building committee, please gather their comments in one round to avoid repeated revisions.

Stage 5: Factory Production and Finishing

Production takes place in our workshop at Rival Street 37 in Tel Aviv. Steel sections are cut, welded and assembled, then checked against the drawing. Finishing is carried out after fabrication, typically hot-dip galvanizing or powder coating, depending on the environment and the look you want. Finishing requires curing and drying time, so it is an important part of the schedule, especially for exterior staircases.

Stage 6: Delivery and Installation

When the staircase is finished, it is delivered and installed on site. Installation involves setting the structure, fixing it to the floor or wall, and fitting the railings and any glass panels. Access to the building, the sequence of other trades and weather conditions all influence how long installation takes. We recommend confirming the site is clear and ready on the agreed date to avoid waiting on the day.

Frequently asked questions

How long does the whole process take from inquiry to installation?

The total duration depends on the complexity of the staircase, the finish selected and how quickly approvals are given. Your project coordinator can give a realistic estimate once the drawing and specification are ready.

Can the production stage be shortened?

Production time is mainly set by the design and finish. Simplifying details, deciding on finishes early and approving drawings quickly are the most effective ways to keep the schedule tight.

Why does the measurement have to be done on site?

Walls, floors and openings are rarely perfectly square or level. Measuring on site ensures the staircase fits the actual space rather than the original plans.

Do I need to be present during measurement and installation?

Being available for measurement helps us confirm details with you directly. For installation, it is useful to have someone on site to confirm access and answer questions.

Common mistakes to avoid

A common mistake is changing the design after the drawing is approved, which forces a new production cycle. Another is scheduling installation before the finishing is fully cured.

Our recommendation

Confirm the finish and final drawing in writing before production starts, and make sure the site is ready on the installation date. These two steps prevent most schedule delays.

Summary

A custom steel staircase follows a clear sequence from inquiry to installation, and the timeline is most predictable when measurements, approvals and site readiness are handled early.

Send us photos and a short description of your staircase pro

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ