top of page
‹ חזרה

Send Your Staircase Plans for a Handrail Proposal

t362-44

t362-44

To get a handrail proposal, send your staircase plans with clear dimensions, the floor levels, and photos of the existing site if there is one. Our team then measures on site, prepares a drawing and written specification for your approval, and only then moves to factory production and installation.

What to Include in Your Staircase Plans

A useful set of staircase plans makes the proposal faster and more accurate. Please send the plan and section drawings of the staircase, with the number of steps, the rise and going of each step, and the floor-to-floor height.

  • Plan view showing the stair width and landings
  • Section showing the total rise and the height of each level
  • Position of walls, openings and any columns
  • Notes on the finish of the steps and the wall

If you only have a sketch or photos, that is still enough to start. We will confirm every dimension on site before anything is produced.

On-Site Measurement Visit

Once we review your plans, we visit the building to measure the staircase ourselves. Drawings can differ from the built structure, so this step protects you from fit problems later.

We check the handrail height, the wall-mounting points, the distance from the wall, and the position of the top and bottom ends. We also note the wall material, since concrete, block and tile each require a different fixing method. Where a railing standard applies, such as the Israeli standard SI 1142, we review the general requirements with you, and exact values are confirmed with your engineer.

Drawing and Written Specification

After measuring, we prepare a drawing of the handrail and a written specification. The drawing shows the profile, the shape of the bends, the brackets and the fixing points. The specification lists the materials, such as iron, stainless steel or aluminum, and the finish.

  • Handrail profile and diameter
  • Bracket type and spacing
  • Material and finishing method
  • Installation sequence

Please review both documents carefully. Any change you request is much cheaper to make at this stage than after production begins.

Client Approval Before Production

Production starts only after you approve the drawing and specification in writing. This is an important checkpoint for architects and contractors, because it confirms that the design, dimensions and finish match what was agreed.

If you are working with a building committee or an interior designer, please share the approved documents with everyone who needs them. A single clear approval avoids confusion during installation.

Factory Production and Finishing

Our factory at 37 Rival Street in Tel Aviv cuts, bends and welds each handrail to measure. Bends are shaped to the angles of your staircase so the rail follows the line of the steps smoothly.

Finishing depends on the material and the environment. Steel handrails are commonly hot-dip galvanized and then powder coated for protection and a consistent colour. Stainless steel parts are finished to the look you choose.

Installation and Final Check

Our installation team fixes the brackets to the wall or floor and mounts the handrail section by section. We check level, alignment and the strength of each fixing before leaving the site.

  • Fixing check on brackets and anchors
  • Alignment of the rail along the full run
  • Clean-up of the work area

Once installed, we walk the staircase with you to confirm that everything matches the approved drawing.

Frequently asked questions

Do I need full construction drawings to request a handrail proposal?

No, full construction drawings are not required. Clear plans with dimensions or good photos are enough, and we will measure on site to confirm the details.

Can you work from photos of an existing staircase?

Yes, photos help us understand the site. We still need an on-site visit to take accurate measurements before we prepare the drawing.

How do you confirm the handrail height and fixing details?

We check the handrail height and fixing points during the site visit and show them on the approved drawing. Exact values for your project are confirmed with your engineer.

Will I see the design before production starts?

Yes, you receive a drawing and written specification for approval. Production begins only after you approve them in writing.

Common mistakes to avoid

Sending plans without the floor-to-floor height or wall material often leads to wrong bracket positions. Skipping the on-site measurement can also cause fit problems that are costly to fix after production.

Our recommendation

Send the stair section along with the plan, and mark the wall material on the drawing. Doing this lets us prepare an accurate proposal faster and avoids surprises during installation.

Summary

Send clear staircase plans, let us measure on site, approve the drawing and specification, and we will produce and install your handrail at our Tel Aviv factory.

Send us your staircase plans today and we will reply with th

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ