Steel Frame Production Timeline: From Inquiry to Installation
t488-24

A custom steel frame order moves through six stages: inquiry with photos, on-site measurement, drawing and written specification, client approval, factory production with finishing, and installation. The overall schedule depends mostly on how quickly drawings are approved and how complex the frame is. Planning around these stages helps you coordinate with the other trades on site.
Stage 1: Inquiry and Photos
Every steel frame project starts with a short inquiry. Send photos of the opening or area, along with rough dimensions and a note on how the frame will be used. Clear photos from a few angles help us understand the site before anyone visits.
At this stage it also helps to mention your target date and any other trades already working on site, such as tiling or plastering. Knowing the sequence early lets us plan the rest of the schedule realistically.
Stage 2: On-Site Measurement
Next, our team measures the opening on site. Measurements are taken at several points because walls and floors are rarely perfectly straight or level. We record the frame's position, fixing surfaces and any obstacles such as pipes or electrical boxes.
- Check that finished wall surfaces are complete or note their final thickness
- Keep access clear for the measuring team
- Tell us about any future changes to the area
Stage 3: Drawing and Written Specification
Using the measurements, we prepare a drawing and a written specification covering profiles, dimensions, fixing method and finish. This is the document you approve before production starts, so take time to review it. Check the sizes, the opening direction and the finish colour.
Drawing approval is often the step that determines the schedule. Changes made after production has started cost more time than changes made now.
Stage 4: Client Approval
Once you sign off the drawing and specification, the order moves into the production queue. Approval confirms that the dimensions and design match what you need. Please reply in writing so there is a clear record of the agreed version.
If the frame connects to railings, glass or a gate, confirm those details at this stage too. Mixing approvals across several documents is a common source of delay.
Stage 5: Factory Production and Finishing
The frame is cut, welded and assembled in our Tel Aviv workshop at 37 Rival Street. For outdoor frames we apply hot-dip galvanizing, and for many projects we add powder coating for colour and extra protection. Each finishing step needs its own time, so the schedule depends partly on the chosen finish.
Before the frame leaves the workshop, it is checked against the approved drawing so that installation runs smoothly on site.
Stage 6: Installation and Handover
Installation is the final stage. The frame is fixed into the prepared opening, aligned and checked for level and plumb. Where the frame must meet a railing or safety element, we confirm that the design follows the Israeli railing standard SI 1142 in general terms, and the engineer checks the exact requirements for your project.
Plan for installation to happen after the surrounding masonry is finished and before final finishes are applied around the frame. Good coordination here prevents rework.
Frequently asked questions
How long does the whole process usually take?
The timeline depends on the size and complexity of the frame, the finish chosen and how quickly drawings are approved. Our team will give you a realistic schedule once the measurements and drawing are ready. Fast approval of the drawing is the biggest factor you can control.
Do I need to be home for the measurement?
Someone should be present or reachable so the team can access the opening and ask questions about the site. The person who will decide on the design details is the best choice. Clear access makes the visit faster.
Can I change the design after approving the drawing?
Changes are possible, but they can add time because the drawing and production plan must be updated. Raising any concerns before approval keeps the schedule on track. Late changes are the most likely cause of delay.
Should the surrounding walls be finished before installation?
In most cases the masonry should be complete so the frame can be fixed and aligned accurately. Final finishes around the frame are usually applied after installation. We recommend agreeing this sequence with your contractor at the start.
Common mistakes to avoid
Approving a drawing without checking the dimensions and finish, and changing the design after production has started. Both can add weeks to the schedule.
Our recommendation
Send clear site photos and confirm the drawing in writing as early as possible, and agree the installation date with your contractor before production begins. Coordinated planning is the simplest way to keep the timeline predictable.
Summary
A steel frame order follows a clear path from inquiry and measurement through drawing approval, factory production and installation. Quick approvals and early coordination with other trades keep the timeline on track.
Related guides
- Factors That Affect Lead Time for Steel Frame Manufacturing
- Inspecting Welds and Joints in Custom Steel Structures
- Preparing Your Site Before Steel Frame Delivery
- Quality Control Checks During Steel Frame Production
- Transporting Custom Steel Frames Safely to Site
- Powder Coating Process for Custom Steel Frames
- All models in this category
Ready to plan your steel frame? Send us photos and rough dim
עוד מדריכים ודפים בנושא
- Inspecting Welds and Joints in Custom Steel Structures
- Quality Control Checks During Steel Frame Production
- Steel Frame Powder Coating Process: From Color Choice to Installation
- Steel Frame Galvanizing Process for Outdoor Structures
- Steel Frame Production Process: How Our Workshop Builds Your Frame
- Steel Frame Surface Preparation and Finishing Guide
- Steel Frame Welding Process: Stages from Measurement to Install
- How We Cut and Shape Steel for Custom Frames at Techno Kol Uzi
- Approval Steps in a Custom Steel Frame Project
- Coordinating Steel Frame Plans With Other Trades