top of page
‹ חזרה

Arrange Stainless Steel Fabrication Pickup From Our Workshop

t474-45

t474-45

You can collect finished stainless steel parts directly from our workshop at 37 Rival Street, Tel Aviv, after we confirm measurements, the drawing and your approval. Arrange the pickup once production is complete and the finishing is done, so the parts are ready to take home or to the site.

Start with an inquiry and photos

Every stainless steel job at Techno Kol Uzi begins with a short inquiry. Send us photos of the area where the piece will go, along with a rough description of what you need, such as a railing, a handrail, a canopy frame or a custom steel structure. Photos help us understand the site before anyone visits, and they let us tell you early whether a workshop pickup makes sense for your piece.

If the part is large or heavy, mention that in your first message so we can plan loading and transport correctly.

On-site measurement and written specification

Before any stainless steel is cut, we measure on site. Accurate measurements prevent mistakes that are expensive to fix later. After measuring, we prepare a drawing and a written specification that lists the grade, dimensions, finish, fixing method and any special details.

  • Measurements taken on site, not from memory
  • Drawing showing dimensions and fixing points
  • Written specification for your approval

Read the drawing carefully before approving it. Once production starts, changes cost time.

Client approval before production

We do not begin fabrication until you have approved the drawing and specification in writing. This step protects both sides: you know exactly what you are getting, and we work from a confirmed plan. If you are a contractor, architect or interior designer, your sign-off on behalf of the client is handled the same way.

Ask questions at this stage. It is much easier to adjust a drawing than a finished part.

Production in our Tel Aviv factory

Production happens in our factory at 37 Rival Street, where the stainless steel is cut, shaped, welded and finished by hand and with workshop equipment. Our team has been working in metal since 1945, and the business is run today by the third generation of the family, so careful craftsmanship is part of how we operate.

Stainless steel is worked differently from iron or aluminum, so we keep weld areas clean and protect the surface during handling to preserve its appearance.

Finishing and preparing for pickup

Once fabrication is complete, the part receives the agreed finish and is checked for fit against the drawing. We confirm that the piece matches the specification before we call you. Parts are wrapped or protected so they arrive in good condition when you collect them.

  • Dimensions checked against the approved drawing
  • Surface inspected and protected
  • Pickup scheduled once the part is ready

Collecting your parts and planning installation

When your part is ready, we will tell you and arrange a convenient collection time at the workshop. Bring a vehicle sized for the piece, or let us know in advance if you need help loading. Plan where the part will be stored so it stays protected until installation.

If you want the piece installed rather than collected, we can discuss on-site installation as a separate step. Exact fixing details and safety requirements, including the general guidance in the Israeli railing standard SI 1142, are confirmed with your engineer before installation.

Frequently asked questions

Can I collect stainless steel parts directly from the workshop?

Yes. Once your parts are finished and checked against the approved drawing, we arrange a collection time at our workshop at 37 Rival Street, Tel Aviv.

Do I need to approve a drawing before production starts?

Yes. We begin fabrication only after you approve the drawing and written specification, so the finished part matches what you agreed to.

How do you make sure the measurements are correct?

We measure on site before cutting any material, then prepare the drawing from those measurements. Checking the drawing carefully before approval is the best safeguard.

What should I bring when I collect the parts?

Bring a vehicle suitable for the size of the piece and any documents we agreed on. If the part is large, tell us in advance so we can plan the loading.

Common mistakes to avoid

The most common mistake is approving a drawing too quickly and discovering a dimension or fixing point is wrong after production. Also avoid arranging a vehicle without checking the size of the finished part first.

Our recommendation

Measure the space again yourself before approving the drawing, and confirm fixing points with your engineer. A few minutes of checking at this stage saves the most time and effort later.

Summary

Arranging a stainless steel workshop pickup is simple when you follow the steps: inquiry, measurement, approval, production, finishing and collection. Clear communication at each stage keeps the result accurate.

Send us photos and a short description of your project, and

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ