top of page
‹ חזרה

Request Stainless Steel Installation Crew for Your Construction Site

t474-47

t474-47

To request a stainless steel installation crew, send Techno Kol Uzi your site details and photos, and we will arrange an on-site measurement. Once you approve the drawing and specification, the work is produced in our Tel Aviv factory and our team installs it on your site.

Start with a clear inquiry

A good inquiry saves time for everyone. Tell us what you need to install, such as railings, handrails, stainless steel works or architectural metalwork, and which floor or area of the site it belongs to.

Photos help a great deal. Include wide shots of the location, close-ups of any existing structure the new work must connect to, and notes on the building schedule. If you already have architectural drawings, send those too.

On-site measurement

Measurement is the step that prevents most problems later. Our team visits the site, checks the actual dimensions rather than the plans alone, and notes levels, wall materials, anchor points and access routes for the crew.

  • Confirm openings and surfaces that were built differently from the drawings
  • Note any finishing work still to come, such as plaster or tiling
  • Check access for lifting and transporting the pieces

Drawing and written specification

After measurement we prepare a drawing and a written specification. The document describes the materials, grade of stainless steel, fixing method, finish and the exact position of each element. Where safety requirements apply, such as railing heights, we confirm the details with the responsible engineer rather than guessing.

Please review the drawing carefully. Once you approve it in writing, we can move to production, and changes at that point are harder and slower.

Production in our factory

Approved work goes into production at our factory at 37 Rival Street in Tel Aviv. Cutting, bending, welding and polishing take place under controlled conditions, which keeps quality consistent across all pieces.

Because most of the fabrication happens in the workshop, less work is needed on site. That usually means a shorter installation visit and less disruption to your other trades.

Finishing and preparation

Stainless steel can be supplied with the finish your project needs, such as brushed or polished surfaces. Each piece is checked before it leaves the workshop so that it arrives ready to fix.

We also plan packing and labeling so that pieces are easy to identify on site, which speeds up the installation crew's work.

Installation by our crew

When the pieces are ready, our installation crew arrives at the agreed date. They fix the works according to the approved drawing, check alignment and levels, and make sure everything is secure before they leave.

Coordinate the visit with your site manager so that the area is accessible and the surrounding trades are not working on the same surface at that moment. A short handover walkthrough at the end helps confirm that the work matches the specification.

Frequently asked questions

Can you send a crew to a construction site that is still under works?

Yes. We plan the installation around the schedule of the other trades, so the surfaces and openings are ready when our crew arrives. Tell us the current stage of the site when you inquire.

Do I need to be present at the on-site measurement?

It helps if a site manager or someone who knows the building can be there. They can point out access routes, existing conditions and any changes made since the plans were drawn.

Who is responsible for the installation fixings?

Our crew fixes the stainless steel works according to the approved specification. Anything that depends on the building structure should be confirmed with your engineer before installation begins.

What should I send first?

Send a short description of the work, photos of the location and, if you have them, the architectural drawings. This lets us understand the job and arrange the measurement quickly.

Common mistakes to avoid

The most common mistake is approving a drawing before the measurements are confirmed on site. Changing a finished piece after production costs far more time than checking the dimensions at the beginning.

Our recommendation

Schedule the measurement before the surrounding finishing work starts, so that the actual openings and surfaces can be recorded accurately. Ask your site manager to keep the installation area clear on the agreed date.

Summary

Send your inquiry with photos, approve the on-site measurement and drawing, and let our factory produce the stainless steel works while our crew handles the installation.

Send us your inquiry and photos today, and we will arrange a

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ