Changing a Gate Design After Approval: What to Expect
t278-30

You can change a gate design after approval, but the change must be documented in a revised drawing and written specification that you approve before production starts. Changes made after fabrication has begun may require reworking parts, so the earlier you raise them, the smoother the process. Contact the factory as soon as you think of a change so the revision can be checked against the on-site measurements.
Why Changes Happen Mid-Project
Many clients only see the real size, the color or the opening style once the gate is near the wall. Changing a mind is normal, and our process is built to handle it. Common reasons include a different swing direction, a new lock or keypad position, a switch from pedestrian to vehicle gate, or a fence design that no longer matches the neighbors' work.
The key is to separate small clarifications from full redesigns. A clarification, such as confirming a finish color, is usually simple. A redesign that changes the frame, the infill or the opening width affects drawings, material and sometimes the installation plan.
Step 1: Tell Us the Change in Writing
Send your request with a photo or a simple sketch and mark exactly what you want to change. Describe the change in plain words: the new width, the new infill pattern, the new hinge side. Mentioning the reason helps us suggest a practical alternative if the requested idea is hard to build on your site.
- Attach the original approved drawing if you have it
- Note the location and the wall or pillar it attaches to
- Say whether the change affects the opening or only the look
Step 2: Re-Measurement on Site
If the change affects dimensions, we return to site to measure again. Even if the first measurement was correct, the surrounding structure may have changed during construction. We check the posts, the floor level, the slope of the driveway and the clearance needed for swing or sliding travel.
For electric or automatic gates, we also check the location of the motor, the power source and the cable route, since these can limit what is practical.
Step 3: Revised Drawing and Specification
After measuring, we prepare a revised drawing showing the new dimensions, profiles, infill and fixing points. A written specification lists the materials, finish and hardware in the same language as the original order. Please read both carefully and compare them with what you asked for.
Our approval step is important. Production begins only after you confirm the revised drawing in writing. This protects both sides and avoids surprises later.
Step 4: Production and What Happens to Parts Already Made
If the gate has not yet entered production, the change is usually straightforward. If some parts are already cut, welded or galvanized, we assess what can be reused and what must be remade. Changes to size or structure are the most likely to require new material, while a change in infill or handle style may leave the frame untouched.
Finishing steps such as hot-dip galvanizing and powder coating happen after the frame is complete, so a late change in color is generally easier than a late change in size.
Step 5: Installation Planning and Final Check
Once the revised gate is ready, we plan the installation around the updated design. Posts, hinges, rollers or motor brackets are set to match the final drawing. Before fixing anything permanently, we check alignment, swing clearance and that the gate closes and latches properly.
- Confirm the opening direction with the installer
- Check that lock and keypad positions suit daily use
- Review safety requirements for railings or gates, referring to the Israeli standard SI 1142 generally
For exact safety values, our engineer will confirm the details for your specific gate.
Frequently asked questions
Can I change my gate design after I have approved the drawing?
Yes, but any change must be documented in a revised drawing and approved again before production continues. The sooner you tell us, the fewer parts need to be reworked.
Will a design change delay my order?
It can, especially if the change requires re-measuring or remaking parts. Minor changes such as color or handle style usually have less impact than changes to size or structure.
Do I need to be on site for the re-measurement?
It helps to be present or to have someone available who knows the site well. Being there lets us confirm the change with you directly.
What if the change I want is not practical for my site?
Tell us what you are trying to achieve and we will suggest workable alternatives. We explain the reason in writing so you can decide with full information.
Common mistakes to avoid
The most common mistake is requesting changes by phone without written confirmation, which leads to misunderstandings about size or finish. Another is changing the opening width after the posts are already set in concrete.
Our recommendation
Before approving any drawing, check the opening dimensions, swing direction and hardware positions against your actual site, and ask for changes in writing as early as possible.
Summary
Changes to an approved gate design are possible when they are requested early, measured on site, documented in a revised drawing and approved in writing before production.
Related guides
- Scheduling Delivery and Transport of Large Gate Panels
- Approving Gate Drawings Before Production Starts
- Packing and Protecting Gates During Transit
- Ordering a Custom Gate: Step-by-Step Purchase Process
- On-Site Installation Steps for a Swing Gate
- Requesting a Gate Quote: What Information to Provide
- All models in this category
Send us your change request and photos today so we can revie
עוד מדריכים ודפים בנושא
- Double Swing Gate Clearance: How to Plan It Right
- Gate Drawing Approval: What to Check Before Production
- Ordering a Custom Gate: Step-by-Step Purchase Process
- Requesting a Gate Quote: What Information to Provide
- Gate Order Lead Time: Stages from Confirmation to Delivery
- Galvanizing and Powder Coating Explained for Gate Owners
- Gate Surface Treatment: Priming and Painting Guide
- Gate Quality Control: How Our Gates Are Inspected
- Stainless Steel Gate Fabrication and Polishing Stages
- Aluminum Gate Production: From Profile Cutting to Assembly