top of page
‹ חזרה

Confirming Your Security Bar Production Schedule Step by Step

t264-42

t264-42

A security bar production schedule is confirmed once measurements are taken on site, the drawings and written specification are approved, and the client signs off on the final design. Production dates are then set in the factory and locked in with the installation appointment. Clear approval at each step prevents delays.

Start with an Inquiry and Photos

The process begins when you send us an inquiry with clear photos of the windows or balconies where you want security bars. Photos of the surrounding wall, the frame type, and any existing fixtures help us understand the job before we visit.

Tell us which openings need bars, whether they are for windows, balconies, or both, and whether you have a preferred finish. This information lets us plan the visit efficiently and gives you a realistic idea of what comes next.

On-Site Measurement Comes First

No production date can be confirmed until we measure on site. Our team checks each opening for width, height, depth, and the condition of the surrounding wall or frame. Small differences between openings are common, so every bar is measured individually.

  • Measure every opening, not just the typical one
  • Check wall material and anchor points
  • Note obstacles such as shutters, pipes, or AC units

Drawing and Written Specification

After measuring, we prepare a drawing and a written specification. The drawing shows the bar pattern, dimensions, and fixing points. The specification lists the material, profile, finish, and installation method for each opening.

Read both documents carefully. This is the moment to ask about bar spacing, the position of hinges or locks, and how the bars will look from the street.

Client Approval Locks the Schedule

Your written approval of the drawing and specification is what allows us to confirm the production schedule. Once approved, the order moves into the factory queue and a manufacturing window is assigned.

Changes after approval can shift the schedule, so take time to review every measurement and detail before signing off. If something is unclear, ask before approving rather than after production has started.

Production and Finishing in the Factory

Our factory at 37 Rival Street in Tel Aviv cuts, welds, and assembles each bar to your measurements. Iron bars are typically finished by hot-dip galvanizing followed by powder coating, which protects them against rust and gives a durable colored surface.

Finishing requires drying and curing time, so the schedule includes these steps. You will be informed when production is complete and the bars are ready for installation.

Installation Appointment and Final Check

Installation is scheduled once the bars are finished. Our installers fix each bar to the wall or frame according to the approved drawing, then check alignment, opening movement, and fixing strength.

Before the crew leaves, we walk through the installation with you, confirm that every opening is complete, and answer any final questions. Keeping the installation date flexible within the confirmed window helps everything run smoothly.

Frequently asked questions

How long before installation should I confirm the production schedule?

Confirm the schedule as soon as you approve the drawing and specification. Early approval lets us plan factory time and set a clear installation window for you.

Can I change the design after I approve the drawing?

Changes are possible but may move the schedule, since production usually starts after approval. Raise any change requests before you sign off.

Do I need to be home for the measurement visit?

It helps to be present or to have someone who can give access to every opening. This allows us to check obstacles and confirm details with you directly.

Why does the finishing step affect the timeline?

Galvanizing and powder coating require specific drying and curing stages. Building these stages into the schedule protects the quality and durability of the bars.

Common mistakes to avoid

Many clients approve a drawing without checking every opening or detail, which later forces changes and delays. Skipping the on-site measurement and relying on rough estimates also leads to bars that do not fit.

Our recommendation

Walk through the drawing with a tape measure in hand and compare each dimension against your actual openings before approving. Ask us to confirm the finish and the installation window in writing so you can plan your schedule with confidence.

Summary

A confirmed production schedule depends on accurate on-site measurement, an approved drawing and specification, and a clear installation appointment. Approving the details early keeps your security bars on track.

Send us photos of your windows or balconies today and we wil

השאירו פרטים ונחזור אליכם

עוד מדריכים ודפים בנושא

bottom of page
הקבוצה שלנו: 🛒 החנות האונליין — סורגים ומסגרות🏠 קובי אלקיים נדל"ן בע"מ