Glass Partition Installation Service: Process and Planning

t432-37

t432-37

A glass partition installation service covers measuring the space on site, preparing a written specification, producing the glass vitrines or partitions in our Tel Aviv factory, and fitting them at your premises. Planning the measurement and approval steps carefully is what makes the installation run smoothly and fit the space exactly.

Starting with an inquiry and photos

Every project begins with a simple inquiry. Send us photos of the room, the area where the partition or vitrine will stand, and a short description of how the space is used. Photos help us understand the lighting, the existing walls and floor, and any obstacles such as pipes, doors or ceiling beams.

Based on this first look, we can tell you whether the project is suited to glass, which type of glass fits your needs, and what information we will need for the next step.

On-site measurement

Accurate measurement is the foundation of a good installation. Our team visits your premises and measures the opening or floor area, the ceiling height and the wall condition. We check that the walls are plumb and the floor is level, because small deviations can affect how a glass panel sits.

  • Width and height at several points
  • Floor and ceiling levels
  • Positions of doors, windows and fixtures

Measuring on site, rather than from a plan, prevents costly corrections later.

Drawing and written specification

After measuring, we prepare a drawing that shows the layout, dimensions, glass thickness, frame or fixing method and the position of any doors or openings. The written specification lists the materials and finishes so there is no guesswork about what will be built.

Please review the drawing carefully. Check the dimensions, the door swing and the positions of handles and hinges. Any question you raise at this stage is far easier to resolve than a change after production.

Client approval

Work does not start until you have approved the drawing and specification in writing. Your approval confirms that the layout, sizes and finishes match what you need. If your building requires a committee or an architect to sign off, we can provide the documents they need for their review.

Once approved, the order moves to production and we will confirm the next steps with you.

Production in our factory

The glass vitrines and partitions are manufactured in our workshop at 37 Rival Street, Tel Aviv. Glass is cut to the approved dimensions, edges are finished, and metal frames and fixings are prepared. Each element is checked against the drawing before it leaves the factory.

Producing in the workshop means the work is done under controlled conditions, which helps the pieces arrive ready to fit on site.

Installation at your premises

On installation day, our team brings the finished elements to your site, sets the frames, fixes the glass and checks alignment, level and the operation of any doors. We protect the surrounding area during work and clear the site afterwards.

Before we leave, we walk through the installation with you so you know how to use and clean the partition or vitrine properly.

Frequently asked questions

How long does the glass partition installation process take?

The timeline depends on the size of the project and the production schedule, so we confirm it with you after the drawing and approval stage. Your inquiry and photos are the first step toward an accurate estimate.

Do I need to be present during measurement?

It helps if someone who knows the premises is available to let us in and answer questions about the space. This makes the measurement faster and more accurate.

Can you install glass partitions in an existing office?

Yes, existing offices are a common setting for our work. We plan the installation around your daily operations and check the existing walls, floor and ceiling before fitting.

Will I receive a drawing before production starts?

Yes, we prepare a drawing and written specification for you to review and approve. Production begins only after your written approval.

Common mistakes to avoid

A common mistake is approving a layout from a rough sketch without a site measurement, which often leads to panels that do not fit. Another is skipping the review of door swing and handle positions on the drawing.

Our recommendation

Mark the exact location of the partition on the floor and ceiling before the measurement visit, and note any outlets, switches or pipes nearby. This preparation shortens the visit and improves the accuracy of the drawing.

Summary

Our glass partition installation service follows a clear path: inquiry, on-site measurement, drawing and specification, your approval, factory production in Tel Aviv, and professional installation on site.

Send us photos of your space and we will arrange an on-site